Match drill
Quote:
Originally Posted by hk1232
Working on my RV-9 now and I see the recommended sequence is to match drill, debur, then rivet the ribs to the spars before doing any work with the skins.
Seems like deburing and dimpling all the skin→rib holes would be easier if everything could be disassembled.
What am I missing that makes it worth doing most of the skin work with ribs in-situ?
|
Because the skin is match drilled to the substructure after it's assembled. Then the skin is removed to prep
Deburring the holes is no problem. I used a 90 attachment with a speed deburring handle.
90 degree deburring tool
__________________
Larry Larson
Estes Park, CO
E-mail: wirejock at yahoo dot com
Builder Blog: http://wirejockrv7a.blogspot.com
Donated 12/2022, plus a little extra.
RV-7A #73391, N511RV reserved
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
|