Good Afternoon Fellow Builders:
As you kow there is a lot of on and off again with pieces and parts andthe HS is no different. I am having two issues:
1: Aligning the HS stabilator with the F-1211 Assembly and getting the AN4-12A bolts engaged o attach the HS to the tailcone.
2: I have tried several types of glue (Krazy glue, JB weld, Permatex... ) to keep the AN960-416(L) washers glued in place. The slightest bit of fiddling and I hear the clink of said washers hitting the deck. I have also tried a set of washer wrenches, but with revision of the bracket there is even less space between the HS and the bearing assembly.
I have tried to use a motorcycle lift with the HS on it and raise and lower the HS to adjust the height, butstill cannot get it alinged.
I have had this problem before, but after several hours of cussing and questioning my decision to buld, I was able to get everything attached.
Any advice would be aprreciated, or just some commiseration.
As you kow there is a lot of on and off again with pieces and parts andthe HS is no different. I am having two issues:
1: Aligning the HS stabilator with the F-1211 Assembly and getting the AN4-12A bolts engaged o attach the HS to the tailcone.
2: I have tried several types of glue (Krazy glue, JB weld, Permatex... ) to keep the AN960-416(L) washers glued in place. The slightest bit of fiddling and I hear the clink of said washers hitting the deck. I have also tried a set of washer wrenches, but with revision of the bracket there is even less space between the HS and the bearing assembly.
I have tried to use a motorcycle lift with the HS on it and raise and lower the HS to adjust the height, butstill cannot get it alinged.
I have had this problem before, but after several hours of cussing and questioning my decision to buld, I was able to get everything attached.
Any advice would be aprreciated, or just some commiseration.