Default Wiring/Firewall Penetrations....

Will likely hang my engine in the next couple of days on my -14. I'm wondering if the two holes/passthroughs provided by Vans are enough to get all the wires through the firewall? Also anything I forgot?

I show a total of 27 items that need to be put through:

__________________
Dues Paid for 2023
RV-14
Emp Complete (including fiberglass)
Wings complete (including fiberglass)
Fuse Complete
Finishing Kit Complete
Avionics Complete
Working on FWF
Reply With Quote
  #2  
Old 10-15-2022, 08:40 AM
jeffw@sc47's Avatar
jeffw@sc47 jeffw@sc47 is offline
 
Join Date: Aug 2014
Location: Simpsonville, SC (SC47)
Posts: 451
Default Just a few >

For starters, at least 4 - 20AWG and maybe 2 - 20AWG shielded, at least 12" FFW and 24" behind the FW for any future stuff. And whatever else you think might reveal itself in the future.

And, consider that for the Throttle/Mix/Prop pass-throughs may be better placed than where Van's allows for them. May need some of those eye-ball swivel pass-throughs or whatever you're comfortable with.
__________________
Jeff Warren
Simpsonville, SC (@SC47 > 10nm NW Triple Tree)
RV-14A (N14ZT), Ser#140195. 11/2022 TT: 65 hrs.
Contribution made 12/7/22 (USArmy 2/67-2/70)
Reply With Quote
  #3  
Old 10-15-2022, 10:49 AM
Ralph Inkster Ralph Inkster is offline
 
Join Date: Feb 2008
Location: Calgary, Alberta
Posts: 2,028
Default

Too tight? Step drill and a bigger insulator sleeve will fix it.
__________________
Ralph
built a few RVs, rebuilt a few more, hot rodded more, & maintained/updated a big bunch more
Reply With Quote
  #4  
Old 10-15-2022, 10:56 AM
Bavafa Bavafa is online now
 
Join Date: Oct 2007
Location: Sacramento, CA
Posts: 4,269
Default

With that list, you will have plenty space with the two provided access holes. I would not drill any other or enlarge unless you really have many other things running thru.
__________________
Mehrdad
N825SM RV7A - IO360M1B - SOLD
N825MS RV14A - IO390 - SOLD
N258SM RV14A - IO390EXP119 - Out of Paint shop & flying
Dues paid
Reply With Quote
  #5  
Old 10-15-2022, 03:54 PM
rocketman1988 rocketman1988 is offline
 
Join Date: Jun 2010
Location: Sunman, IN
Posts: 3,364
Default Pass through

If you are in need of an Avery SS firewall pass through, I have one that I did not use on my -10.

Make you a deal on it...
__________________
Bob
EAA Tech Counselor
Aerospace Engineer '88

RV-10-ER
N464RL
In Paint at Evoke!
Garmin G3X-T, Barrett EFII S32, CAI, MTV-9B

Dues+ Paid 2022,...Thanks DR+
Reply With Quote
  #6  
Old 10-15-2022, 03:58 PM
DanH's Avatar
DanH DanH is offline
 
Join Date: Oct 2005
Location: 08A
Posts: 11,365
Default

How many you want?
.
Attached Thumbnails
Click image for larger version

Name:	Available Penetration Fittings.jpg
Views:	173
Size:	152.7 KB
ID:	32255  
__________________
Dan Horton
RV-8 SS
Barrett IO-390
Reply With Quote
  #7  
Old 10-16-2022, 06:11 AM
Reflex Reflex is offline
 
Join Date: Jan 2015
Location: Kansas
Posts: 246
Default

Many thanks for the replies. Was just wondering if the two holes Van's provided was enough.

Nice looking stuff Dan, if I need to add, I'll go that direction.
__________________
Dues Paid for 2023
RV-14
Emp Complete (including fiberglass)
Wings complete (including fiberglass)
Fuse Complete
Finishing Kit Complete
Avionics Complete
Working on FWF
Reply With Quote
  #8  
Old 12-12-2022, 07:58 AM
claycookiemonster's Avatar
claycookiemonster claycookiemonster is offline
 
Join Date: Oct 2007
Location: Midway, UT
Posts: 572
Default Can I add to this?

I'm at the exact same place. Just hung the engine, and now I find myself in a place I know almost nothing about. Mine is an 8, so if that makes a difference, I apologize for piling on.

I looked through this list (thank you, by the way!) and added three more things, Cabin Heat control, Oil Cooler Valve and Fuel Line. You repeated CHT Cyl 1, so by my count you had 26. I now have 29 penetrations.

In my mind, I have 4 categories:
Mechanical linkages: throttle, mixture, prop, Cabin heat, Oil cooler shutter and alternate air.
Fluid: fuel.
Power lines: Battery, E-mag 1, E-mag 2, Alt 1, Alt 2, Alt 1 Shunt, Alt 2 shunt and Starter.
Sensor lines: Oil Press, Oil Temp, Fuel Flow, Fuel Press, MAP, Tach, EGT 1, 2, 3, 4, and CHT 1, 2, 3, 4.

Fuel is by itself.
Since Power and Sensor do not mix well, that seems like two more penetrations.
Mechanical? I see the Van's holes for throttle/mixture and prop, so that's making me think the mechanical connections have their own penetration, or can they be grouped as well?

Am I kinda, sorta on the right track here?
__________________
Clay "Cookiemonster" Cook
USAF: T-38, F-111F
American Airlines: 727, MD80, 757, 767, 737
RV8 #81751 project sold
RV8 #81651 project acquired
https://theonceandfutureflyer.wordpress.com/
Donations up to date thru December 2022

"...serenity...courage...and wisdom..."
Reply With Quote
  #9  
Old 02-14-2023, 04:55 PM
rockitdoc's Avatar
rockitdoc rockitdoc is offline
 
Join Date: May 2020
Location: Fort Collins, CO
Posts: 845
Default Six holes total

I have two 7/8” holes for every wire except big 6AWG main bus wire. Then, one for throttle and mixture, one for cowl flap and one for alt air and prop. The alt air prop is a double eyeball as is the throttle mixture.
__________________
14A-EXP119 Thunderbolt
Begun 07-23-20
Emp Completed 11-12-20
Slo Fuse Completed 3-2-21
QB Wings 99% Complete 7-30-22
Wiring and Avionics 85%
Cowl Completed sans paint 10-30-22!
2023 Dues Paid
Reserved: N52XL

Last edited by rockitdoc : 02-14-2023 at 05:03 PM.
Reply With Quote
  #10  
Old 02-14-2023, 06:38 PM
Halleffect Halleffect is offline
 
Join Date: Aug 2020
Location: Greensboro, GA
Posts: 21
Default

Quote:
Originally Posted by Reflex View Post
Will likely hang my engine in the next couple of days on my -14. I'm wondering if the two holes/passthroughs provided by Vans are enough to get all the wires through the firewall? Also anything I forgot?

I show a total of 27 items that need to be put through:

This is not an EXP119, correct? The EXP FWF kit should come with a third, eyeball-style passthrough for engine control cables. It gets installed just below the existing one on the right side.
__________________
Mark

RV-14A 140999
N83MV reserved

PA28-236
PA28-181

3J7 Greene County, GA
'23 Dues Paid
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 02:26 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.