  #1  
Old 03-26-2023, 05:45 PM
Kahle76 Kahle76 is offline
 
Join Date: Feb 2016
Location: Jackson, Missouri
Posts: 13
Default Build time for each kit

I知 currently finishing up our fuselage and our finish kit is scheduled for crating in April or May. Wings and empennage are finished. I知 trying to decide when to order the power plant and avionics. Could you let me know how many build hours it took you to complete each of the six kits? I understand that everyone痴 skill level is different so I was hoping to extrapolate my completion for the last three kits and order the last two kits accordingly.

Thanks
__________________
Mike Kahle
Jackson, MO

Kitfox Classic IV
Building RV-12is

Last edited by Kahle76 : 03-26-2023 at 05:50 PM.
Reply With Quote
  #2  
Old 03-26-2023, 10:16 PM
Fisherpd Fisherpd is offline
 
Join Date: Oct 2020
Location: Sun CIty West, AZ
Posts: 26
Default Might want them both soon

I was planning to get the avionics kit, then the power plant, with significant time between them, based on the order of the section in the instructions. what I got was both of then close together and reasonably rapidly after the finish kit was delivered. Actually I got the avionics kit just before the finish Kit and the power plant a month later.

This was actually an advantage because you will end up jumping between them. The finish kit includes the cowling and a note that is should not be installed until the engine is in place. The avionics instructions in some places assume that the engine wiring is already in place, but there is a note in the final assembly instructions (section 38 Finish kit) that indicates that it would be easier to install some of the wiring and the fuel pump assembly before the tail is joined to the fuselage. Working around back-ordered parts also didn't help. (Side note: when you do get close to being blocked by a missing part - CALL VANS. They have been very good about getting me back-ordered parts when I got to a stoppage.)

I was able to do both the fuel pump and the main wire harness before the join. The fuel pump would definitely be a PITA to do laying in the baggage area. Doing the wire harness didn't save as much, simply because the difficulty is getting it into the bottom of the fuselage, which is the same whether or not you have a tail connected.

If I had to guess - the instructions seem to have been written for the avionics to be installed after the power plant was done, even though they have lower section numbers. The avionics sections have you removing a the tunnel and other covers that were installed in the (later) engine sections.

What ever you do, be rigorous about keeping track of what is done and what is to be done.

However that is one mans situation. Your mileage may vary.
Reply With Quote
  #3  
Old 03-27-2023, 09:03 AM
ResidentStranger ResidentStranger is offline
 
Join Date: Dec 2020
Location: Kalispell, MT
Posts: 44
Default

Not anything really new to add to prior comment...just my comments since I'm in that situation now.

I'm doing the last 3 at this time and have been jumping all over due to what was previously mentioned -the instructions pretty much tell you to and back order items moves you to something else...having more kits gives you more options as well. If you want the easiest build possible, have all three on site. Engine on prior to cowling (essential), common wiring before tail attach (I did - probably easier) - and fuel pumps (definitely easier). I had to push the canopy until it warms up as well - so that's last for me.

Seems like their numbered order is pretty good but the level of guidance is a lot looser than the prior kits as far as order goes as you noticed. Unlike the prior kits, I don't think you can get in serious trouble changing the order unless it's in the notes but you don't get the warm fuzzy getting specific guidance like earlier kits (my experience).

Just a note from one of my screw ups - when putting on the landing gear, be sure to use permatex #2 to seal the brake connectors (not teflon tape) and put them in the gear legs really tight (probably tighter than you expect you would have to). I had to take one off 2 more times to stop a tiny leak before I really torqued it on there and it's good. Check them a few days later looking for the brake fluid seeping.
Reply With Quote
  #4  
Old 03-27-2023, 09:27 PM
DaveWelch DaveWelch is offline
 
Join Date: Mar 2005
Location: Keystone Heights, FL
Posts: 547
Default

Caution: Experience has been mixed with Permatex#2 in brake and fuel connections. I switched to Locktite#567 to fix leaks. Recommend a thorough search of these forums to decide. Arguments and experience go both ways.
__________________
Dave
RV12, 6 years flying.
No paint, still looking for design inspiration.
Reply With Quote
  #5  
Old 03-28-2023, 06:57 AM
thiggins thiggins is offline
 
Join Date: Mar 2020
Location: Saluda,NC
Posts: 226
Default

Quote:
Originally Posted by DaveWelch View Post
Caution: Experience has been mixed with Permatex#2 in brake and fuel connections. I switched to Locktite#567 to fix leaks. Recommend a thorough search of these forums to decide. Arguments and experience go both ways.
I知 also sticking with Loctite 567.
__________________
Donation 2023 paid
ASEL INST COMM Tail-wheeler
RV-12iS builder (Empennage complete, Wings complete!, Fuselage well under way!, finish kit under way!, Garmin avionics under way!, engine ordered, shop out of order )
Got a hangar, and moved some large pieces in!
https://eaabuilderslog.org/?blproject&proj=7buPHH99v
Reply With Quote
  #6  
Old 03-29-2023, 04:04 AM
G JWTP G JWTP is offline
 
Join Date: Feb 2022
Location: Kent U.K.
Posts: 11
Default

Quote:
Originally Posted by Kahle76 View Post
I知 currently finishing up our fuselage and our finish kit is scheduled for crating in April or May. Wings and empennage are finished. I知 trying to decide when to order the power plant and avionics. Could you let me know how many build hours it took you to complete each of the six kits? I understand that everyone痴 skill level is different so I was hoping to extrapolate my completion for the last three kits and order the last two kits accordingly.

Thanks
I'd order now, subject to $$$'s, as the engine and avionics are on such a long lead in time you'll be twiddling all sorts of things while you wait. Also the cost of things rarelly goes down.
For me from opening the first crate to finished took 3 years. Now when you set aside 6 months waiting for stuff, 6 months when it was too cold in the workshop to do anything. 3 months for the UK LAA/CAA , our EAA/FAA, to process the paperwork and then another month for the general faffing about waiting for weather etc, to carry out test flying going to Oshkosh et cetera!! I got to a build time of around 20 months. Each section took roughly an equal amount of time,That was pretty much some work every or every other day. I also primed everything, everywhere, but left the external painting to a professional. Engine and avionics took no time at all to fit. Engine cowls were an absolute 'faff', don't even think about trying anything to do with them untill you have the engine mounted. Spend time on the fuel and brake lines to get them right!! Because getting back in there when you've finished it all is another 'faff', I know!! Don't attempt anything to do with the perspex/lexan parts until the temperature is above +25C preferably +30C. Fibreglass work to the canopy was easier than I thought just follow the instructions and temperature guidelines, 'peel ply' should be worshipped!!

If you want any other info just ask.

John.
Attached Thumbnails
Click image for larger version

Name:	20221012_094512.jpg
Views:	110
Size:	340.5 KB
ID:	40289  Click image for larger version

Name:	20191014_105207_1571074391931_resized.jpg
Views:	63
Size:	190.4 KB
ID:	40290  
Reply With Quote
  #7  
Old 03-29-2023, 09:33 PM
Kahle76 Kahle76 is offline
 
Join Date: Feb 2016
Location: Jackson, Missouri
Posts: 13
Default

Great info! Thanks, I知 busy working except for the winter months which is when I can do the building. My fuselage has definitely taken longer than the wings and empennage. I doubt if I get very much time to work on the finish kit when it痴 scheduled to arrive in June.
__________________
Mike Kahle
Jackson, MO

Kitfox Classic IV
Building RV-12is
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 08:23 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.