I've tried a few things (lots of things) and need some advice. I've got the showplanes fastback top skin on across the three bulkhead tops supplied by Showplanes. I marked the approx hole location and fluted. Drew a line down the middle of the flange.
I'll be derned if I can get the middle of the flange in the hole center to drill it. The aft most bulkhead is the one I'm on; was going to move forward one at a time. To get a hand on it I put the skin on with the aftmost small bulkhead and aft deck on, then once the skin was on the longerons both sides I removed the aft bulkhead to get hand access to the first aftmost Showplanes bulkhead.
It is a slippery devil. Is this just a two-person job and I need to get a helper? Or is there a better way I haven't thought of yet? The goal is to start at the top and work down to the side each side.
I'll be derned if I can get the middle of the flange in the hole center to drill it. The aft most bulkhead is the one I'm on; was going to move forward one at a time. To get a hand on it I put the skin on with the aftmost small bulkhead and aft deck on, then once the skin was on the longerons both sides I removed the aft bulkhead to get hand access to the first aftmost Showplanes bulkhead.
It is a slippery devil. Is this just a two-person job and I need to get a helper? Or is there a better way I haven't thought of yet? The goal is to start at the top and work down to the side each side.