tyconnell
Well Known Member
Greetings,
Having sought a solution from the mothership for my plight, the recommendation came down to use an 8-32 screw instead of another attempt with a rivet.
Not sure what specific screw to use - an NAS 1801 type screw looks like it will do the trick, however I'm not sure of the following:
- Is this the right one or is there a better choice?
- How do I figure out the correct length? I need to secure about 1/4" of aluminum, comprised of several layers.
- All metal or elastic stop nut? Loctite?
- Other thoughts?
Having sought a solution from the mothership for my plight, the recommendation came down to use an 8-32 screw instead of another attempt with a rivet.
Not sure what specific screw to use - an NAS 1801 type screw looks like it will do the trick, however I'm not sure of the following:
- Is this the right one or is there a better choice?
- How do I figure out the correct length? I need to secure about 1/4" of aluminum, comprised of several layers.
- All metal or elastic stop nut? Loctite?
- Other thoughts?