Default -9A V-stab to 712 bulkhead

When I built my vert stab, I believe the plans said to leave the two lower outside rivets of the lowest hinge bracket until assembly. I'm now mounting the v.stab to the fuse and wondering if these rivets are supposed to go through the 712 bulkhead as well.

On DWG 27A, it says to use 4-7 rivets, "flush on fwd side all vertical stab rear spar to spar doubler to hinge bracket rivets", with a revision marking (R2). The note for R2 says...

R2: "fwd side all vertical stab..." was " fwd side all blkhd to vertical stab".

So it looks like it used to be intended for these rivets to go through the bulkhead, but now they don't. Is this correct? So the only thing that goes through the rear spar to the bulkhead is the 2 bolts through the up elevator stop, plus the 4 bolts through the tie-down?

Photo to illustrate...
__________________
Phil
RV9A (SB)
Flying since July 2010!
Ottawa, Canada
Reply With Quote
  #2  
Old 05-18-2008, 02:05 PM
WilburD2 WilburD2 is offline
 
Join Date: Aug 2007
Location: Houston, Tx
Posts: 163
Default Bolts not rivets?

Phil: holding in my hands my vintage April of '07 plans, The step in the Vert stab assy reads quote" the VS-410pp hinge brackets have two holes missing from pattern. Use holes in spar channel and spar doubleras drill guides and backdrill the entire 6 hole pattern through the upper VS-410PP only. The corner holes in the lower VS-410PP will be drilled for bolts later, in assembly with the fuselage."
The notes on the dwg 27a now reads: "AN426AD4-7 flush on fwd side all vert stab rear spar to spar doubler to hinge bracket rivets".

So the answer to the question is, yes the only thing going thru the bulkhead now is the bolts.

My guess is the factory probably left rivet setting and/or direction vague in the area till the first customers installed them wrong and wondered why the vertical wasn't sitting square to the bulkhead...
__________________
Bill S.
A+P, RV Dreamer + Schemer
RV-9 preplans in hand
Reply With Quote
  #3  
Old 05-18-2008, 07:16 PM
Noel Simmons's Avatar
Noel Simmons Noel Simmons is offline
 
Join Date: Nov 2006
Location: Lewistown
Posts: 161
Default drill for bolts

I am quite certain that these are for bolts.
__________________
Noel Simmons (repeat builder) just ordered my 40th it's an 8!
406-538-6574
A&P CFI EAA Tech/EAA flight adviser
Reply With Quote
  #4  
Old 05-19-2008, 06:03 AM
wpisar wpisar is offline
 
Join Date: Mar 2005
Location: Long Island, New York
Posts: 38
Default

I agree with WilburD2. I just took a look at mine. Only thing going thru the bulkhead are the bolts. That hinge bracket is riveted in 6 places to the spar and doubler only. Besides it seems unnecessary to put two rivets through the bulkhead when you have 4 bolts in such close proximity and it would prevent removal of the Vertical Stab. without drilling out the rivets.
Reply With Quote
  #5  
Old 05-19-2008, 08:50 AM
mikehoover's Avatar
mikehoover mikehoover is offline
 
Join Date: Jan 2005
Posts: 626
Default

Quote:
Originally Posted by prkaye View Post
When I built my vert stab, I believe the plans said to leave the two lower outside rivets of the lowest hinge bracket until assembly. I'm now mounting the v.stab to the fuse and wondering if these rivets are supposed to go through the 712 bulkhead as well.

On DWG 27A, it says to use 4-7 rivets, "flush on fwd side all vertical stab rear spar to spar doubler to hinge bracket rivets", with a revision marking (R2). The note for R2 says...

R2: "fwd side all vertical stab..." was " fwd side all blkhd to vertical stab".

So it looks like it used to be intended for these rivets to go through the bulkhead, but now they don't. Is this correct? So the only thing that goes through the rear spar to the bulkhead is the 2 bolts through the up elevator stop, plus the 4 bolts through the tie-down?

Photo to illustrate...
Phil,

Those two corner points in your photo are for rivets on the 9A models. This coulda shoulda been done when riveting the other four hinge bracket to doubler to spar rivets. I left mine undone early on as well, only to have do it just before mounting the VS to the fuse. But it is a different set up compared to the taildragger, which incorporates tail mount/VS bolts near these locations. Like someone mentioned earlier, only bolts go thru the bulkhead. Look at DWG 27A for the bolt hole locations. I drilled the initial #30 pilot holes for the bolts from inside the fuse with the angle drill, stepping up to #21 then to the finished hole size of 3/16".
__________________
Mike Hoover
Columbia, SC
www.aclog.com/rv-9a/
www.eaa242.org/
N194MH first flight on 08-26-12
Reply With Quote
  #6  
Old 05-19-2008, 10:18 AM
rjcthree's Avatar
rjcthree rjcthree is offline
 
Join Date: Jan 2007
Location: Bay Village, OH
Posts: 1,024
Default Funny, I'm in the exact same place

Yesterday, I was in the same place. Went back to old drawings. No mention of 426-4's on the lower bracket, only to leave open for bolts.

Newer revs add rivets to spar to bracket, and bolts beside - only the bolts go through the bulkhead.

I'm like others what wonder why bother with the rivets when the bolts are clearly a stronger member. Instructional inertia will hold however, and I'll put hte rivets in, I'm sure.

Helpful hint: Home depot has 12" bits in 1/8, 3/6 and 1/4 for $8.

Second hint: REmove elevators and pushrod before trying to mount vert stab.

Third helpful hint: File away the longerons to abotu 1/16 at teh edge, otherwise you will scar your VS spar.

Fourth helpful hint: the rivet at the bottom of the side skin is the exact place where the end of the VS spar should locate for correct bracket height. (7 11/32").


Rick 90432 Fuse, mounting emp.
Reply With Quote
  #7  
Old 04-11-2021, 07:17 PM
ScottK ScottK is offline
 
Join Date: Feb 2007
Location: SLC, UT
Posts: 82
Default

I guess this is still an unsolved issue? Do we have a consensus?

I'm working on my 9A VS and still wondering about those two rivets on the bottom corners of the lower VS-410 hinge bracket. The instructions say nothing; the drawings (6 and 27A) say they exist on tri-gears. As mentioned above, this bracket is later drilled for attach bolts, making us wonder if the rivets are even needed. Are they? If I'm to include them, it needs to happen at initial assembly of the spar/doubler, because it needs to be flush on front and that can't be done properly after assembly.
__________________
Scott K
KU42 / RV-9A [Wings]
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 10:57 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.