Been busy with the holidays and such but still working.
Starting work on the spar carry through. Installing nutplates.
Nutplates installed
Fitting the end pieces
Bulkhead stiffeners fitted
Fitting cover plate supports.
Rivets installed. I used the squeezer where it would reach. Once again, it had been awhile since I installed any rivets and it showed.
Finished except for the spar spacers. Had to order -14 rivets. They may be here somewhere.
Per the instructions, I assembled the control sticks then removed them. Ill put this bulkhead aside for now.
__________________
Fly safe,
Vern
Ozark, Al
RV-7 Build No. 71139
Empennage Complete, Wings on hand
Starting Fuselage 11/15/19
https://eaabuilderslog.org?s=lhead
Exempt but gladly donating!
|

01-09-2020, 07:03 AM
|
|
|
Join Date: Sep 2007
Location: Central IL
Posts: 6,563
|
|
Vern with that bulkhead loose it is a good time to consider your equipment and make some extra holes in that spar web. Vans has a template for that showing what is permissible.
War Eagle!!
__________________
Bill
RV-7
|

01-09-2020, 07:19 AM
|
|
|
Join Date: Jan 2009
Location: Ozark, AL
Posts: 87
|
|
Thank you Bill. I’ll check into it.
WAR EAGLE!
__________________
Fly safe,
Vern
Ozark, Al
RV-7 Build No. 71139
Empennage Complete, Wings on hand
Starting Fuselage 11/15/19
https://eaabuilderslog.org?s=lhead
Exempt but gladly donating!
|

01-11-2020, 07:32 AM
|
 |
|
|
Join Date: Jul 2016
Location: Worland, Wyoming
Posts: 2,233
|
|
Quote:
Originally Posted by BillL
Vern with that bulkhead loose it is a good time to consider your equipment and make some extra holes in that spar web. Vans has a template for that showing what is permissible.
War Eagle!!
|
Big +1. It can be done without adding a hole but it's not fun and it's close. If I could do it again I would of added a couple holes at this point. Also, with your control column, make sure that puppy is perfect and moves like it is on air. If you want to see what I recently did to fix my friction problem see post 468 here.
__________________
Jereme Carne
PPL
RV-7A Flying as of 03/2021
|

01-11-2020, 02:41 PM
|
|
|
Join Date: Dec 2015
Location: Auburn, AL
Posts: 253
|
|
I ran some wires/static tubing underneath both canopy rails to prevent having to drill holes in the spar. Works good
__________________
Steve T.
CFII/MEI/ATP 737,DC-10
RV-7, Lyc IO360
AUO
|

01-12-2020, 09:50 PM
|
|
|
Join Date: Jan 2009
Location: Ozark, AL
Posts: 87
|
|
Quote:
Originally Posted by BillL
Vans has a template for that showing what is permissible.
War Eagle!!
|
Can someone point me to that template? I have the digital plans and so far haven't found anything.
__________________
Fly safe,
Vern
Ozark, Al
RV-7 Build No. 71139
Empennage Complete, Wings on hand
Starting Fuselage 11/15/19
https://eaabuilderslog.org?s=lhead
Exempt but gladly donating!
|

01-12-2020, 09:57 PM
|
 |
|
|
Join Date: Jul 2016
Location: Worland, Wyoming
Posts: 2,233
|
|
Quote:
Originally Posted by vernh59
Can someone point me to that template? I have the digital plans and so far haven't found anything.
|
Here it is.
__________________
Jereme Carne
PPL
RV-7A Flying as of 03/2021
|

01-13-2020, 04:53 AM
|
|
|
Join Date: Jan 2009
Location: Ozark, AL
Posts: 87
|
|
Thank you Jereme
__________________
Fly safe,
Vern
Ozark, Al
RV-7 Build No. 71139
Empennage Complete, Wings on hand
Starting Fuselage 11/15/19
https://eaabuilderslog.org?s=lhead
Exempt but gladly donating!
|

01-22-2020, 08:01 PM
|
|
|
Join Date: Jan 2009
Location: Ozark, AL
Posts: 87
|
|
Assembling the F705 bulkhead. Drilling the Anti-Splat, almost 14, attachment.
Primed and read for rivets. Fortunately, I could squeeze most of these.
Installing the nut plates.
Riveting the Anti-splat attachment.
Done.
Assembling rear spar carry through.
Spar straps
Seat belt attachments

__________________
Fly safe,
Vern
Ozark, Al
RV-7 Build No. 71139
Empennage Complete, Wings on hand
Starting Fuselage 11/15/19
https://eaabuilderslog.org?s=lhead
Exempt but gladly donating!
|

01-30-2020, 07:08 AM
|
|
|
Join Date: Jan 2009
Location: Ozark, AL
Posts: 87
|
|
Starting the F 706 bulkhead components. Drilling the reinforcing angles.
Assembling the bulkhead for match drilling.
Primed bell crank riveting together.
assembled 728 and 729 angles.
Assembled F730, F728 and F729
F706 ready to rivet together.
F707 assembled for riveting.
Double bulkhead F711.
__________________
Fly safe,
Vern
Ozark, Al
RV-7 Build No. 71139
Empennage Complete, Wings on hand
Starting Fuselage 11/15/19
https://eaabuilderslog.org?s=lhead
Exempt but gladly donating!
|
Thread Tools |
Search this Thread |
|
|
Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 12:28 AM.
|