VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Model Specific > RV-7/7A
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 06-12-2014, 05:02 PM
aeroaddict's Avatar
aeroaddict aeroaddict is offline
 
Join Date: Apr 2013
Location: KEUL
Posts: 222
Default Possible extra holes in the spar & ribs?

I'm building the rt wing leading edge assembly and have come across an issue that I do not see on the left wing. I did not build the left wing and it is complete minus bottom skins and control linkages.

Two leading edge ribs outboard of the tie down have two extra holes per rib. The attached pics show the spar (poor picture quality) and one of the ribs in question on top of a 'normal' rib. The spar holes have anodize in them, so it came from the factory this way. The left wing leading edge ribs and spar do not have the extra holes from what I can see.

I researched the plans and b/p's and searched here on VAF without success. I also have a email in to Van's but have yet to hear back after 4 days. I would like to keep building but need an answer or clarification.

[IMG][/IMG]

[IMG][/IMG]
__________________
Dan
RV-7 Slow Build - Sold

KEUL

Last edited by aeroaddict : 06-12-2014 at 05:04 PM.
Reply With Quote
  #2  
Old 06-12-2014, 05:12 PM
Mike S's Avatar
Mike S Mike S is offline
Senior Curmudgeon
 
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,420
Default

They might be tooling holes, used to hold a part in a jig or die during the manufacturing process.
__________________
Mike Starkey
VAF 909

Rv-10, N210LM.

Flying as of 12/4/2010

Phase 1 done, 2/4/2011

Sold after 240+ wonderful hours of flight.

"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
Reply With Quote
  #3  
Old 06-12-2014, 05:53 PM
cln1owner's Avatar
cln1owner cln1owner is offline
 
Join Date: Jan 2006
Location: Ehprata, WA
Posts: 318
Default

Quote:
Originally Posted by aeroaddict View Post
[IMG][/IMG]
Dan, something in this photo looks funny. The lines of large rivets, what exactly are they holding to the spar web? Could you give us a larger view of the spar?
__________________
Nate Benson
Ephrata, WA
RV9A/Slider N608MA
Flying

KitProject.com


"If you think you can do a thing, or think you can't do a thing, you're right." -- Henry Ford
Reply With Quote
  #4  
Old 06-12-2014, 06:01 PM
wirejock's Avatar
wirejock wirejock is offline
 
Join Date: Oct 2005
Location: Estes Park, CO
Posts: 3,947
Default Holes

I don't remember extra holes out of the box but I do remember ribs got drilled with two extra holes because the standard holes do not line up with the holes in the spar. It was in the manual I think. I just looked at mine and that pattern of holes looks correct.
__________________
Larry Larson
Estes Park, CO
http://wirejockrv7a.blogspot.com
wirejock at yahoo dot com
Donated 12/03/2019, plus a little extra.
RV-7A #73391, N511RV reserved (2,000+ hours)
HS SB, empennage, tanks, wings, fuse, working finishing kit
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
Reply With Quote
  #5  
Old 06-12-2014, 06:22 PM
aeroaddict's Avatar
aeroaddict aeroaddict is offline
 
Join Date: Apr 2013
Location: KEUL
Posts: 222
Default

The large rivets are part of the spar build up by Van's. Spar view is orientated looking up from the bottom flange of the spar. Forward is the flat spar face shown. Outboard is left, inboard is right.

Larry, I'll recheck the manual again, but the curious thing is that the left wing doesn't show any extra spar holes.
__________________
Dan
RV-7 Slow Build - Sold

KEUL
Reply With Quote
  #6  
Old 06-12-2014, 07:14 PM
hayabusa hayabusa is offline
 
Join Date: Feb 2011
Location: Brisbane, Australia
Posts: 37
Default

From memory only 3 of the 5 holes in the rib flange match the holes in the spar in some leading edge rib locations. The two that do not line up (top and bottom ones) are not used, and two new ones are back drilled from the pre drilled holes in the spar. A total of 5 rivets attach the rib to the spar.
Unless that is a sharpie dot in you spar photo, it looks as though someone has drilled two extra holes in your spar using the holes in the rib that were to remain unused, so you have 7 holes in that rivet line for the rib. I think they are to remain unused due to designed edge distances from the main spar rivets.
If you do have extra holes in your spar,wait for Vans to respond.
Reply With Quote
  #7  
Old 06-12-2014, 07:46 PM
aeroaddict's Avatar
aeroaddict aeroaddict is offline
 
Join Date: Apr 2013
Location: KEUL
Posts: 222
Default

Well that is what I was afraid of. Looks like I'll wait for the reply from Van's. I would think that if I just riveted all holes that it would be not an structural issue, but I'll wait for a reply.
__________________
Dan
RV-7 Slow Build - Sold

KEUL
Reply With Quote
  #8  
Old 06-12-2014, 11:13 PM
hayabusa hayabusa is offline
 
Join Date: Feb 2011
Location: Brisbane, Australia
Posts: 37
Default

Page 7-3 of your manual. ASSEMBLING THE WING SKELETON. MAIN RIB/SPAR ASSEMBLY. 2nd paragraph.
"Most of the ribs simply fit to the spar without modification, However, two W-709 ribs just outboard of the tiedown require two new rivet holes (one near the top, the other near the bottom). Drill these using the holes in the spar as guides. The two holes left unused in the rib are simply abandoned. A similar situation applies to W-711 L&R in the wing walk."

In your spar photo it looks like someone did all that and then back-drilled the "abandoned" holes into the spar using the rib as a guide, and you now have 7 rivet holes in your spar where there should only be 5. you`ll have to check all four rib locations plus the wing walk area where the spar is much more highly stressed and see if the error is repeated there as well.

If that's correct, then in my opinion, Vans are the only people to advise you on this.

Last edited by hayabusa : 06-12-2014 at 11:22 PM.
Reply With Quote
  #9  
Old 06-13-2014, 07:12 AM
aeroaddict's Avatar
aeroaddict aeroaddict is offline
 
Join Date: Apr 2013
Location: KEUL
Posts: 222
Default

You are correct. I went back and checked and found the statement. I haven't check the wing walk area but will do so.
__________________
Dan
RV-7 Slow Build - Sold

KEUL
Reply With Quote
  #10  
Old 06-16-2014, 05:11 PM
aeroaddict's Avatar
aeroaddict aeroaddict is offline
 
Join Date: Apr 2013
Location: KEUL
Posts: 222
Default Update

Called and talked with Van's today, bottom line; build on. Van's recommended to use structure screws and lock nuts which I will do.

Van's stated they had no empirical data to substantiate any decision one way or the other. After a discussion, logic prevailed; it would be very hard to imagine that no one else had done this before, no reported wing failures on the -7, 3 diameters ED maintained on all 'extra' holes, extra holes are outboard past the bell crank and not inboard towards the high load areas.
__________________
Dan
RV-7 Slow Build - Sold

KEUL

Last edited by aeroaddict : 04-06-2016 at 10:40 AM.
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 01:59 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.