I wondered the same thing while working that part. I also came to the same conclusion you did. It's ok to rivet the F-704 C/D (L&R) to the F-704 A/B during the F-704 assembly. I don't think you are making it too complicated. Questioning the drawings like you are helps to minimize all the "Gotchas" that seem to pop up from blindly following along. At least that's been my experience.
Quote:
Originally Posted by Ottertrack
I've searched through the drawings and read through the instructions and have not been able to determine when it is time to rivet F-704C & D to the F-704A & B. I'm wondering if I need to wait until later. Drawing 22 exploded view tells me I can do the riveting during the "Assembling the F-704 Bulkhead" as described on page 8-2. Perhaps I am complicating this too much? Thanks.
|
__________________
Ken
?Aviation is not so much a profession as it is a disease.? Anonymous
Building an RV-7
Empennage complete, fuselage 75%, wings 75%.
|