Sequencing a slow-build wing .. what to do first?
Hi VAF Brain Trust,
I'm prepping my shop to start building slow-build wings on -7 and was wondering if there is a particular advantage to building any of the parts first ... control surfaces then main wing panels, or vice-versa?
The shop is set up the empennage build, it is would seem make sense to build the control surfaces first, then reconfigure for the wing stands and the main wing panels.
Thoughts?
__________________
Bill Bencze
N430WB RV-7 #74152 @ KHAF, tip-up; IO-360-M1B; Hartzell CS. !! Phase 1 !!
2357 hrs over 8.5 years to get to flying. Log at: http://rv7.wbencze.com
VAF 2020 donation happily made
|

06-17-2013, 01:00 PM
|
 |
|
|
Join Date: Jan 2008
Location: KTCY
Posts: 643
|
|
Quote:
Originally Posted by wjb
... wondering if there is a particular advantage to building any of the parts first ... control surfaces then main wing panels, or vice-versa?
Thoughts?
|
Follow the manual... In most cases there is a rhyme to the reason...
__________________
Dave & Trina
RV-9A Flying  - 330 Hrs. Painted  Finishing the interior.
|

06-17-2013, 02:42 PM
|
 |
|
|
Join Date: Sep 2007
Location: WA
Posts: 988
|
|
Both at the same time...
If you have the room, consider building both at the same time.
__________________
Stephen
RV7 powered by a lycoming thunderbolt IO-390
turning a whirlwind HRT prop
with more hours flying than building... 2,430 on the hobbs!
ORCA Flight
Race 771
margarita!
|

06-19-2013, 10:44 PM
|
|
|
|
Join Date: Jul 2009
Location: Petaluma, CA
Posts: 233
|
|
yes build them
build the control surfaces, you had practice on the tail group and there is a bunch of skill transfer between them.
__________________
Bill Mason
RV7 SB in construction
Avionics, Wiring, FWF, interior, and paint to go.
|

06-20-2013, 03:05 AM
|
 |
|
|
Join Date: Aug 2006
Location: Secluded Lake,Alaska (AK49)
Posts: 359
|
|
My sequence
I started with the aft spars, then did all the rib work while looking here and all the build sites. Then I did the spar and put one wing together less the bottom skins. Then the tank. I'm taking a break from the other wing and slowly doing flight controls during the summer. Winter is serious build time here in Alaska.
|

06-24-2013, 10:47 AM
|
|
|
|
Join Date: Jul 2005
Location: lexington, KY
Posts: 330
|
|
I followed the builder's manual sequence...
...but I would never do that again.
Agree totally with what Instructor Bill says above. It's just logical and will save you a bunch of time. By the time I finished the wings and got around to the flaps and ailerons, I had completely forgotten how I built the elevators and rudder.
I see the builder's manual as a good-faith first effort which has never been properly updated; consequently, it leaves MUCH to be desired. In many cases, there are different and/or better ways to do things.
Just my perspective; some will vehemently disagree, I'm sure.
__________________
Thanks,
Jarvis
Purchased flying RV-7A 
RV-7A emp finished, wings next.
|

06-24-2013, 10:51 AM
|
|
|
|
Join Date: Jul 2005
Location: lexington, KY
Posts: 330
|
|
Also agree with Stephen...
...if there's a Left and a Right--build'em both at the same time if you can possibly make the space to do so.
Saves time, make for better continuity, etc.
__________________
Thanks,
Jarvis
Purchased flying RV-7A 
RV-7A emp finished, wings next.
|

06-26-2013, 08:25 PM
|
 |
|
|
Join Date: Nov 2012
Location: Half Moon Bay, CA
Posts: 1,035
|
|
Thanks!
Thanks everyone for the input ... my kit should arrive in a week or so. Since I have the time, I've been spending too much on the fiberglass portions of the empennage ... boy, I sure do like metal over spongy, googey, icky, fiberglassy stuff. Happy I didn't choose an 'easy as my plane!
__________________
Bill Bencze
N430WB RV-7 #74152 @ KHAF, tip-up; IO-360-M1B; Hartzell CS. !! Phase 1 !!
2357 hrs over 8.5 years to get to flying. Log at: http://rv7.wbencze.com
VAF 2020 donation happily made
|

06-26-2013, 09:10 PM
|
 |
|
|
Join Date: Oct 2005
Location: Estes Park, CO
Posts: 3,947
|
|
wings
Keep us updated. I plan to start with both wings on jigs.
I pick up my wing and fuse kits Friday.
__________________
Larry Larson
Estes Park, CO
http://wirejockrv7a.blogspot.com
wirejock at yahoo dot com
Donated 12/03/2019, plus a little extra.
RV-7A #73391, N511RV reserved (2,000+ hours)
HS SB, empennage, tanks, wings, fuse, working finishing kit
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
|

07-05-2013, 03:49 PM
|
 |
|
|
Join Date: Oct 2009
Location: Edson, Alberta, Canada
Posts: 483
|
|
What I did was do the wings first....
I did the wings, left and right first and then the wing tanks. At the end of that process was a very large component of a real live airplane which motivated me to keep bangin rivets and continue on to the flaps and aierlons in that order. Cant wait to do the fuse and actually sit in it and make airplanes noises.
Good luck with your build. I know I will never build another set of tanks now.... ever! 
__________________
Dave Cobb
[color="Red"]=VAF=2019 Donation - and a bit extra for great work![/COLOR="blue"]
Empennage RV 7 - Tipper
Wings complete
Dynon installed and running
Fuse closer to completion, Canopy complete
AME reviewed and repaired O-320-Lyc installed
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 05:36 AM.
|