My log shows a grand total of 230 hrs in my QB wings. That includes all conduit, wiring, wingtip installations, landing lites, skin riveting, aileron/flap installations, electrical testing, wingtip antennae, etc. (does not include final wing installation on the fuse.) Also take into account I am a slow builder. (No wisecracks, please.

)