VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Model Specific > RV-12/RV-12iS
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 02-25-2012, 06:40 AM
pietermk pietermk is offline
 
Join Date: May 2009
Location: Maryland
Posts: 132
Default Page 9-03 step 2

good morning,

My question is regarding the step mentioned above but ran into it when going thru page 9-05 step 4. When getting ready to rivet the counter sunk holes with the CS4-4 rivets when I noticed I did not have enough of the CS4-4 rivets. Going back to page 9-03 I figured out that I used the CS4-4 in more than the 2 places mentioned in the instructions

https://picasaweb.google.com/lh/phot...eat=directlink In this picture you see a CS4-4 rivet in the right holes and I already drilled out the one from the left hole. When doing this I was wondering when these holes would be riveted. I went through several builders logs and the instructions but it seems that they are not riveted at all.
in this second picture https://picasaweb.google.com/lh/phot...eat=directlink you see the end of the spar box and the CS4-4 rivet is still in, should I removed it, should it stay and I missed it somewhere in the instructions?

I already received extra CS4-4 rivets from Vans but want to make sure if and when to rivets the "middle holes" of the spar doublers and spar caps

thanks

Peter
__________________
Peter
See my builders log, I received the tail kit on February 2011, still working on it. I need more free time Dues paid for 2017
http://www.mykitlog.com/PeterRV12/
Reply With Quote
  #2  
Old 02-25-2012, 09:07 AM
AJSWA AJSWA is offline
 
Join Date: Sep 2011
Location: Paraburdoo Western Australia
Posts: 52
Default Cs4-4 rivets

Peter,

The first pic isn't all that clear as far as showing if you have countersunk any other -4 holes other than the one in the picture (with the rivet in it). HS-1211 only has 2 of -4 countersink holes in each spar caps (as well as the 4 of -3 c/s holes). 1 in the centre of each of the centre 2 upper and lower spar caps through HS-1212 ribs (revision 0 12/18/08) see page 09-02 most left item in pic.)

AJSWA
__________________
Andrew
RV 120573
Reply With Quote
  #3  
Old 02-25-2012, 09:18 AM
Mich48041 Mich48041 is online now
 
Join Date: Apr 2008
Location: Riley TWP MI
Posts: 3,068
Default

I do not want to take the time to figure out when that hole gets a rivet. Instead, I offer some general advice.
Follow the plans exactly.
Keep in mind that the stabilator spar gets covered with skin. Therefore no rivet heads should be sticking up in the way of the skin.
Before closing up any part with skin, make sure that every hole has a rivet or that it will be riveted when the skin is riveted in place.
Read ahead in the plans so that you understand how everything fits together.
Looking at Figure 3 on page 09-08 might answer your specific question.
I have posted hints that might be helpful.
http://www.vansairforce.com/communit...ad.php?t=70542
Joe Gores
Reply With Quote
  #4  
Old 02-25-2012, 03:00 PM
sandpiper sandpiper is offline
 
Join Date: Nov 2009
Location: Independence, OR
Posts: 316
Default

I second what Joe says. I went through the same process of questioing this and wondering why, then read ahead and then followed the plans exactly.
__________________
John Horn (donated for 2020)
Independence, OR
LSRM-A, CFII
Rotax Service, Maintenance, and Heavy Maintenance Trained
Building an RV-12, N7878H reserved
Flying a Flight Design CTSW
Reply With Quote
  #5  
Old 02-26-2012, 05:34 AM
pietermk pietermk is offline
 
Join Date: May 2009
Location: Maryland
Posts: 132
Default

Quote:
Originally Posted by AJSWA View Post
Peter,

The first pic isn't all that clear as far as showing if you have countersunk any other -4 holes other than the one in the picture (with the rivet in it). HS-1211 only has 2 of -4 countersink holes in each spar caps (as well as the 4 of -3 c/s holes). 1 in the centre of each of the centre 2 upper and lower spar caps through HS-1212 ribs (revision 0 12/18/08) see page 09-02 most left item in pic.)

AJSWA
thanks for your reply, I did countersink the other holes

Peter
__________________
Peter
See my builders log, I received the tail kit on February 2011, still working on it. I need more free time Dues paid for 2017
http://www.mykitlog.com/PeterRV12/
Reply With Quote
  #6  
Old 02-26-2012, 05:37 AM
pietermk pietermk is offline
 
Join Date: May 2009
Location: Maryland
Posts: 132
Default

Quote:
Originally Posted by Mich48041 View Post
I do not want to take the time to figure out when that hole gets a rivet. Instead, I offer some general advice.
Follow the plans exactly.
Keep in mind that the stabilator spar gets covered with skin. Therefore no rivet heads should be sticking up in the way of the skin.
Before closing up any part with skin, make sure that every hole has a rivet or that it will be riveted when the skin is riveted in place.
Read ahead in the plans so that you understand how everything fits together.
Looking at Figure 3 on page 09-08 might answer your specific question.
I have posted hints that might be helpful.
http://www.vansairforce.com/communit...ad.php?t=70542
Joe Gores
Joe & John, thanks I understand what you are saying, RTFML LOL I will look at the specific step you referenced. I made the mistake of putting the CS4-4 rivets in all the center holes but can easily drill them out.

Thanks again

Peter
__________________
Peter
See my builders log, I received the tail kit on February 2011, still working on it. I need more free time Dues paid for 2017
http://www.mykitlog.com/PeterRV12/
Reply With Quote
  #7  
Old 03-08-2012, 02:00 PM
N604RV N604RV is offline
 
Join Date: Nov 2008
Location: Morris, IL
Posts: 8
Default Rv 12 spar box

I agree with reading the plans closely!

Next , the first picture referenced is the inner most set. That set of holes will NOT be covered by the skins. The next one outside of that WILL be under the skins and the hole spacing will require you to use the forward center and aft holes for the skin.

The same for the outboard most set.
Reply With Quote
  #8  
Old 03-08-2012, 07:31 PM
pietermk pietermk is offline
 
Join Date: May 2009
Location: Maryland
Posts: 132
Default

thanks for the additional info

Peter
__________________
Peter
See my builders log, I received the tail kit on February 2011, still working on it. I need more free time Dues paid for 2017
http://www.mykitlog.com/PeterRV12/
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 11:17 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.