100 ft per minute.
Paul, I am off until the 20th. I am going to SC this weekend, but other than that, I am availabe to help. Just let me know.
To test my static system before the IFR cert, I used a turkey injector with some surgical tubing. It wokred great.
I had two leaks: Air around the Safeair ports between the skin and the port. This was really a testing issue with the way they hook up the machine to test the system. The second leak was my pitot tube.
The third leak was my brain. I was trying to meet a 100ft per hour requirement instead of the per minute spec. When I finally went for the cert, I passed with flying colors, all the way to 22K ft.
http://www.vansairforce.com/communit...ad.php?t=69849
__________________
Alton DeWeese
N526RV RV7A Tip Up, IO360 180 W/Hartzel BA prop.
Flying ~950 hours since Aug 2010
N4IDH
Construction Log
?The secret of getting ahead is getting started. The secret of getting started is breaking your complex overwhelming tasks into small manageable tasks, and then starting on the first one.?
?Mark Twain