I bought a partially-completed RV-6 project last year. I don't want to admit how many hours I have spent staring at it and reviewing the plans. Getting into a project in the middle is quite intimidating for a newbie. It's essentally a completed airframe, awaiting engine and systems.

I bought an engine (Mattituck TMXIO-320) and the appropriate Firewall Forward kit from Vans. A sensible plan for attacking the firewall would seem as follows:

Before hanging the engine...
*** battery box
*** cabin heat valve
*** oil sensor line along firewall
*** doublers (fuel line, starter solenoid)
*** brake reservoir

After the engine is in place...
*** gascolator (fuel injected engine, but mandatory in Canada)
*** sensor manifold
*** starter solenoid
*** battery master relay
*** oil breather line
*** electrical/sensor pass-through
*** throttle and mixture controls
*** battery cable
*** cabin heat control
*** fuel line

Does that make sense? Are there any other items that MUST/SHOULD be installed on the firewall before I hang the engine? Opinions most appreciated.

Rob
Reply With Quote
  #2  
Old 06-12-2011, 06:50 AM
Paul K Paul K is offline
 
Join Date: Mar 2009
Location: Grand Rapids, MI
Posts: 1,004
Default FWF planning

Yes and NO, Anything installed with nutplates needs to go on before the engine. It's really hard to install nutplates after the engine is hung because there isn't much room between the back of the engine and the FW. For example, if you are using an external regulator, it needs to be changed at some time in the future and screws into nutplates makes that easy. Another example would be whatever method you are using to pass the throttle cable etc through the FW needs to be installed first. I would preinstall as much stuff as you can.

I found that after I hung the engine on the engine mount for the first time, it has been removed from the FW at least 4 times. Just remove the 6 nuts holding the engine mount to the FW and remove the entire engine and mount assembly. This only takes minutes and makes it easy to find the placement of things as you go.

I just finished my FWF installation and I think the engine might be in place for the final time. Have fun, I found this part of the project to be very satisfying.
__________________
Paul K
West Michigan

Unfortunately in science, what you believe is irrelevant.

2020 donation made, exempt but worth every dime!
Reply With Quote
  #3  
Old 06-12-2011, 08:38 AM
Mike S's Avatar
Mike S Mike S is offline
Senior Curmudgeon
 
Join Date: Sep 2005
Location: Dayton Airpark, NV A34
Posts: 15,420
Default

If you have any thoughts to insulating the firewall, do it before hanging the engine.

http://www.vansairforce.com/communit...ight=fibrefrax
__________________
Mike Starkey
VAF 909

Rv-10, N210LM.

Flying as of 12/4/2010

Phase 1 done, 2/4/2011

Sold after 240+ wonderful hours of flight.

"Flying the airplane is more important than radioing your plight to a person on the ground incapable of understanding or doing anything about it."
Reply With Quote
  #4  
Old 06-12-2011, 08:44 AM
pczar3's Avatar
pczar3 pczar3 is offline
 
Join Date: Jul 2005
Location: Bolingbrook, Illiniois
Posts: 254
Smile As much as you can

Hi Rob, welcome to the wonderful world of "I should have done that first!" I am working on the FWF on my very slow build -6A. I have the electrical wired with the obvious exception of the alternator and starter cables. I have all the penetrations drilled with cable feed-throughs. I have the gascolator mounted as well as the oil and fuel pressure sensors. The cabin heat valve is in place and all mag wiring. One other thing to be sure of is to put the elbow on the engine for the oil pressure gauge (with the restrictor). You'll find lots of posts here about doing that because you won't get it in once the engine is hung. If you look at some of the builders web sites you can find a lot of good pictures of where stuff goes. Are you putting in the firewall mounted battery instead of the cabin mounted? Most builders do and I decided to go that way as well. Good luck and happy building.
Paul
__________________
Paul
N694BP reserved
RV-6A Very Slow Build!
Reply With Quote
  #5  
Old 06-13-2011, 08:24 PM
RViter RViter is offline
 
Join Date: Jun 2009
Location: Mesa, AZ
Posts: 242
Default Doesn't seem obvious but ...

everything that was said seems logical, put as much on as possible. I've spent the last two weeks doing F/W mounting tasks. Wasn't on my 'list' yet, but then each item seemed to beg for installation in preparation for doing a lot of the other wiring, or closing up the forward cabin. For example, once the oil filter F/W recess is riveted, the easy access to the inside to bolt, rivet or wire is greatly impeded. (Unless you have a building buddy on the inside).

Visualize the process of adding something AFTER the engine is hanging in front of the F/W and you can imagine the complexity.

Try www.mykitlog.com and do a search for RV-6/6A and you'll find some company. Or even the -7 or -9 pages. They're all about the same in concept.
__________________
gary
RV-6A QB Tip-Up, 1st Flight 3/18/17
O-360-J2A (modified & F/I), Sensenich FP (cruise)
VP-X Sport, Dynon SkyView, VFR day
(FFZ) Mesa, AZ - N234GB -
www.mykitlog.com/garyc
Reply With Quote
  #6  
Old 06-14-2011, 01:04 AM
gasman gasman is offline
 
Join Date: Mar 2007
Location: Sonoma County
Posts: 3,821
Default

Rob, This might help, and it is cheap........

Call Van's and order RV7 drawings 19, op26, op27, op28, and 0p29.
Reply With Quote
  #7  
Old 06-14-2011, 07:19 PM
RViter RViter is offline
 
Join Date: Jun 2009
Location: Mesa, AZ
Posts: 242
Default Why stop there ...

Quote:
Originally Posted by gasman View Post
Rob, This might help, and it is cheap........

Call Van's and order RV7 drawings 19, op26, op27, op28, and 0p29.
get a whole new 'refresh' of the drawings (plans). Well worth the $, and contains some of the updates (for example RV-7/7A) FWF plan instead of the original RV-6/6A layout.
__________________
gary
RV-6A QB Tip-Up, 1st Flight 3/18/17
O-360-J2A (modified & F/I), Sensenich FP (cruise)
VP-X Sport, Dynon SkyView, VFR day
(FFZ) Mesa, AZ - N234GB -
www.mykitlog.com/garyc
Reply With Quote
  #8  
Old 06-15-2011, 11:03 AM
aero_tango aero_tango is offline
 
Join Date: Feb 2006
Posts: 81
Default As much as you can...

Hi Rob,
I'm in Gatineau (CYND). You can come and see my RV-7a. It might be a lot easier for you to look at the real thing and we can chat around what to do before hanging the engine.... Email me if you want .(aero_tango@sympatico.ca)

Michel
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 06:33 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.