VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Model Specific > RV-8/8A
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 08-07-2010, 04:42 PM
chinch chinch is offline
 
Join Date: Feb 2010
Location: Dunedin, New Zealand
Posts: 97
Default Actual build times?

Hi everyone.

I'm trying to do the maths on QB vs standard RV8 kit. When I first started my -8 emp kit back in 1998, the standard kit was widely thought to require ~2000 build hours. But since then, kits are now prepunched (on what work I was able to do on the emp, I spent a LOT of extra hours agonizing over jigs and alignment) and the QB kits are also available.

Does anyone have *actual* build times from workshop ready to flying on an 8 or 8a, QB or standard?

Thanks very much in advance
Chris
__________________
Chris Hinch
Dunedin, New Zealand
False start on RV8 in 1998, starting over 2010.
Reply With Quote
  #2  
Old 08-07-2010, 08:09 PM
twsurveyor's Avatar
twsurveyor twsurveyor is offline
 
Join Date: Jan 2005
Location: Ridgetop, Tennessee
Posts: 134
Default Actual build times?

Quote:
Originally Posted by chinch View Post
Hi everyone.

I'm trying to do the maths on QB vs standard RV8 kit.
Does anyone have *actual* build times from workshop ready to flying on an 8 or 8a, QB or standard?
Chris
Chris, I have several friends who have done QB's and several friends who have done standard Kits.

First off, a lot depends on the quality of construction you want. Do yo want an "averege" RV with a VFR panel or one approaching "show quality" with the latest and greatest IFR panel? Secondly, I have come to the conclusion that "build times" (in hours) are misleading. I tend to think of "build time" in terms of years (that is if you , like most of us, are a part time builder)!

All that being said, I'd say build time for an "average QB RV" would be 2-3 years and 4-5 years for an "averege standard kit". If you want show quality add another year or two! Hope this helps!

IMHO,

Tommy
__________________
Tommy Walker
Ridgetop, TN (1M5)
RV-6A, N 350 TW
830 Hrs & "Climbing?!
Reply With Quote
  #3  
Old 08-07-2010, 08:21 PM
scard's Avatar
scard scard is offline
 
Join Date: Jun 2005
Location: Cedar Park, TX
Posts: 3,152
Default

RV9A Oshkosh award winner, standard build, 2700 build hours.
__________________
Scott Card
CQ Headset by Card Machine Works
CMW E-Lift
RV-9A N4822C flying 2200+hrs. / Cedar Park, TX
RV8 Building - fuselage / showplanes canopy (Done!)
Reply With Quote
  #4  
Old 08-07-2010, 08:33 PM
apkp777's Avatar
apkp777 apkp777 is offline
 
Join Date: Oct 2008
Location: Schaumburg, IL
Posts: 2,053
Default

Never will win an award -9, 1030 hours (standard build).
__________________
Tony Phillips
N524AP, RV 9 (tail wheel)
Reply With Quote
  #5  
Old 08-07-2010, 11:16 PM
sglynn's Avatar
sglynn sglynn is offline
 
Join Date: Mar 2008
Location: Anacortes, WA
Posts: 823
Default slow build

I'm about to finish the canopy and I'm at 1200 hours and 2 years calendar time. I work full time (more than full time) but kids are grown and moved. So I work on it a couple hours a day and weekends. It's only taken two years to build the empennage, wings, fuselage, and canopy. And I've learned a lot. The thing about the fast build is will you really learn the skills you want and need to work on it in the future. I doubt it. Go slow build.
__________________
Steve Lynn
RV-7A
Flying Phase I
Anacortes, WA
www.mykitlog.com/sglynn
Reply With Quote
  #6  
Old 08-08-2010, 12:52 AM
bruceh's Avatar
bruceh bruceh is online now
 
Join Date: Mar 2008
Location: Ramona, CA
Posts: 2,367
Default One year in...

I started on my RV-9A empennage 8/20/09. Took 2 months to complete and immediately started on the wings. Finished them in 6 months. Started on the fuselage 4/26/10. As of this week I'm working on the brake pedals and forward fuselage. Still have several months at least before the fuselage is done. Not sure when I'll pull the trigger on the really expensive stuff (engine/avionics) since I have 2 kids in college to pay for.

I work on the project pretty much every evening for a couple of hours and on the weekends between other household chores. I've probably taken 60 days off in the last year due to travel and family commitments. Not really keeping track of the hours. It goes by fast if you keep a steady pace. I started out with a 5 year plan, but will hopefully have it flying in much less time. It is going together much faster than I thought it would.
__________________
Bruce Hill
RV-9A N5771H flown over 800 hours!
http://www.overthehills.com/RV-9A-Project
APRS Tracking for KJ6YRP and New Flying Blog
2020 VAF donator
EAA Tech Counselor, Build assistance - canopy/tanks/fiberglass/electrical/repairs
Reply With Quote
  #7  
Old 08-08-2010, 04:56 PM
AirbusPilot AirbusPilot is offline
 
Join Date: Jul 2007
Location: Santiago, Chile
Posts: 447
Default

My slow build RV-8 took two years. Empenage 2 month, Wings 8 months, fuselage at quick build stage 2 months, finish kit 4 to 5 months, Instrument and FF 2 or 3 months, painting 4 months.

I worked on my free days, about 10 days a month 10 hours a day.
__________________
Fernando Abasolo
Santiago Chile
SubSonex waiting for tailkit to arrive
Flying phase II RV-8 (SCSE) Serial Number 83290, Tail Number CC-AJC
Flying RV-8 (SCTB) Phase II 600 hours and counting since February 22nd 2010
Serial Number 82727, Tail Number CC-PXG
Lyc. IO-360, Hartzell Prop
VAF #2056
EAA Member 774981
Reply With Quote
  #8  
Old 08-08-2010, 05:58 PM
Vlad's Avatar
Vlad Vlad is online now
 
Join Date: Oct 2008
Location: Utah
Posts: 8,144
Default

Speaking of hours my RV probably wins. I spent approximately 35,040 hours already (started in 2006) and still not done What's your method of counting the hours?
__________________
Where is N666BK?

Не имей сто рублей, а имей сто друзей.
Reply With Quote
  #9  
Old 08-08-2010, 08:06 PM
Jaypratt's Avatar
Jaypratt Jaypratt is offline
 
Join Date: Jan 2005
Location: Hicks Airfield, Fort Worth,Texas
Posts: 1,727
Default time

I have built about 36 Rvs. Most of them have been with the owners helping with the build.
I have built 7 solo. Most have taken me around 600 hours to build the QB to a rolling airframe, including FWF. The rest of the story is,,,,,, the panel and glass parts take about another 400 hours. 1000 hours to build a RV8,7 QB, carb, vfr...

Add a bunch of hours to make it a nose roller, fulie, IFR,

I like to build a simple RV. Keep it simple and build your RV light. It will kik A.....
__________________
Jay Pratt VAF #2
RV Central - Builder Assistance
Paul Revere, Borrowed Horse, & Shooter

Last edited by Jaypratt : 08-09-2010 at 07:26 AM.
Reply With Quote
  #10  
Old 08-08-2010, 08:44 PM
chinch chinch is offline
 
Join Date: Feb 2010
Location: Dunedin, New Zealand
Posts: 97
Default

Quote:
Originally Posted by Vlad View Post
Speaking of hours my RV probably wins. I spent approximately 35,040 hours already (started in 2006) and still not done What's your method of counting the hours?
Hah! I squeezed my first rivet on my 8 back in 1998, ...lemme see, carry the one, add my shoe size, I make it over 100,000 hours and the skin still isn't on the HS! That's got to be a record.... (of shame )
__________________
Chris Hinch
Dunedin, New Zealand
False start on RV8 in 1998, starting over 2010.
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 02:40 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.