Whats in these bags
Finishing kit order time and I'm wondering if anyone can tell me what's in these bags and do I need them or delete?
Bag 1531 Cowl Camlocks
Bag 924-3 C/S Spinner Hardware
bag 945 Added spinner hardware
I'm fitting a showplaces cowl with full sky bolt kit.
3 Blade Hartzell at this stage
Thanks!
__________________
---------------------
Chris
RV-10.
Emp complete (minus fiberglass)
Wings started
First RV-10 build in Hong Kong
Donation made 2020
|