Default Horizontal Stabilizer -- Use a Doubler?

So I had to drill out (again!) a rivet in the inboard nose rib-doubler-spar-shim-main rib joint. I've had such a problem getting these rivets set and getting the parts to lay flat and not clinch, but I finally figured out that they're better squeezed, and to squeeze them you have to install them before installing the attach angle just inboard of them (which, once installed, pretty much forces you to buck, and bucking through all those parts requires a pretty high driving pressure, which I think is what's been giving me trouble).

Anyway, in the process of getting the rivet out, I must have nicked the side of the hole in the nose rib flange that mates to the doubler; it's just a little bit oversized, and only in one small spot where it goes to 0.137" for a #30 nominal hole. (The hole in the doubler got some dings around it, too, possibly while I was getting the rivet out of there.)

Van's says insert a rivet and build on... but that I could install a doubler on the nose rib flange (which I interpret to mean adding an 0.025" sheet (same thickness as the nose rib) the size of the nose rib flange with holes drilled to match). My questions for the group are:
  1. Would you use a doubler here? Why or why not?
  2. If I were to use a doubler, what length of rivet should I use? I reason that I should use a 4-8 rivet because the parts to be riveted together (0.025" doubler + 0.025" nose rib + 0.125" spar doubler + 0.063" spar + 0.040" shim + 0.025" main rib) are 0.303", which would leave a 0.197" bucktail, and this exceeds the 1.5D (1.5*0.125"=0.1875") shown in the big diagram in Section 5 of the manual... but that's the same rivet length without the doubler, so...

Pictures (album at https://imgur.com/a/rCBg9pn):

The troublesome hole!
The corresponding hole in the spar doubler, if it matters.

Thanks for your help, everyone.
__________________
Will, building an RV-9A
Horizontal stabilizer in progress
Donated September 2019
Reply With Quote
  #2  
Old 06-05-2020, 07:31 PM
wirejock's Avatar
wirejock wirejock is offline
 
Join Date: Oct 2005
Location: Estes Park, CO
Posts: 3,947
Default Doubler

Quote:
Originally Posted by NotMuchofaStall View Post
So I had to drill out (again!) a rivet in the inboard nose rib-doubler-spar-shim-main rib joint. I've had such a problem getting these rivets set and getting the parts to lay flat and not clinch, but I finally figured out that they're better squeezed, and to squeeze them you have to install them before installing the attach angle just inboard of them (which, once installed, pretty much forces you to buck, and bucking through all those parts requires a pretty high driving pressure, which I think is what's been giving me trouble).

Anyway, in the process of getting the rivet out, I must have nicked the side of the hole in the nose rib flange that mates to the doubler; it's just a little bit oversized, and only in one small spot where it goes to 0.137" for a #30 nominal hole. (The hole in the doubler got some dings around it, too, possibly while I was getting the rivet out of there.)

Van's says insert a rivet and build on... but that I could install a doubler on the nose rib flange (which I interpret to mean adding an 0.025" sheet (same thickness as the nose rib) the size of the nose rib flange with holes drilled to match). My questions for the group are:
  1. Would you use a doubler here? Why or why not?
  2. If I were to use a doubler, what length of rivet should I use? I reason that I should use a 4-8 rivet because the parts to be riveted together (0.025" doubler + 0.025" nose rib + 0.125" spar doubler + 0.063" spar + 0.040" shim + 0.025" main rib) are 0.303", which would leave a 0.197" bucktail, and this exceeds the 1.5D (1.5*0.125"=0.1875") shown in the big diagram in Section 5 of the manual... but that's the same rivet length without the doubler, so...

Pictures (album at https://imgur.com/a/rCBg9pn):

The troublesome hole!
The corresponding hole in the spar doubler, if it matters.

Thanks for your help, everyone.
If Vans says no doubler is needed then don't complicate matters.
If you're having difficulty getting parts to stay together, use the rubber tube method.
Also, pre-squeeze the rivet a tiny bit to keep it from shifting.
__________________
Larry Larson
Estes Park, CO
http://wirejockrv7a.blogspot.com
wirejock at yahoo dot com
Donated 12/03/2019, plus a little extra.
RV-7A #73391, N511RV reserved (2,000+ hours)
HS SB, empennage, tanks, wings, fuse, working finishing kit
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
Reply With Quote
  #3  
Old 06-05-2020, 10:19 PM
jcarne's Avatar
jcarne jcarne is offline
 
Join Date: Jul 2016
Location: Worland, Wyoming
Posts: 1,365
Default

No way would I use a doubler there. That hole is barely out of spec it would appear.
__________________
Jereme Carne
PPL
RV-7A Emp. done
Wings done
Fuselage done
Finish kit almost done
Exempt but gladly paying!
Reply With Quote
  #4  
Old 06-06-2020, 01:40 AM
PaulvS's Avatar
PaulvS PaulvS is offline
 
Join Date: Aug 2019
Location: Western Australia
Posts: 333
Default no doubler

Hi Will,
As per the other comments, I also don't think you need an extra doubler, it will just make things more complicated than is necessary, that hole really doesn't look too bad and the rivet will fill it when set.

But I would suggest practising gun riveting with some various scrap aluminum to develop the technique, we all had to learn this. There are lots and lots of similar rivets later on in the build that cannot be reached with a squeezer and you just have to use the gun and bucking bar. You could practice with different length rivets, varying the air pressure, try different weight bucking bars etc. until you can do it consistently, and then do the real parts.

That trick of using a small piece of rubber tubing on the rivet tail works very well to help bring the parts together without clinching, so practice that too.
__________________
Paul vS (yes I'm also a Van)
Building RV-6A #22320 O-320 FP. Wings and tail complete, working on fuselage
Flying my low-n-slow Aeroprakt A-22 and the aero club's RV-9A while I build

Last edited by PaulvS : 06-06-2020 at 01:46 AM.
Reply With Quote
  #5  
Old 06-06-2020, 07:33 AM
tyconnell's Avatar
tyconnell tyconnell is offline
 
Join Date: Jul 2007
Location: Keller, TX
Posts: 220
Default

As others have said, no doubler.

If this is where I think it is, I messed it up also, though I also oversized the hole pretty badly and had to go up to a -5 on it. At that point I just went with a Cherry Max rivet, which was OK'd by Vans. You'll find squeezing in that area tough as the squeezer wants to interfere with the rib angles - it's kind of a "V" shape in there, yes? I talked to another builder about it, and he bent the ribs to the appropriate angle after the rivets were set.

Quote:
Originally Posted by NotMuchofaStall View Post
...0.025" doubler + 0.025" nose rib + 0.125" spar doubler + 0.063" spar + 0.040" shim + 0.025" main rib) are 0.303", which would leave a 0.197" bucktail, and this exceeds the 1.5D (1.5*0.125"=0.1875") ...
That's a lot of math there! Are you aware of tools like these: One Piece Rivet Gauge? That tool will allow you to quickly stick a rivet into the hole and determine the proper length without having to do all the algebra (which I would get wrong).
__________________
Ty Connell
ty.connell@gmail.com
Donated 2020

Last edited by tyconnell : 06-06-2020 at 08:07 AM.
Reply With Quote
  #6  
Old 06-06-2020, 04:10 PM
NotMuchofaStall NotMuchofaStall is offline
 
Join Date: Apr 2018
Location: Seattle, WA
Posts: 10
Default

Thanks everyone for the sanity check! No doubler it is.

For the record, I have successfully drilled out dozens of rivets without much difficulty once I got the hang of it (and the proper tools)! I?ve actually finished most of the rest of the empennage short of closing things up (I?d like a tech counselor to look things over before I close anything that can?t be inspected in service), and I?m coming back to the HS. I had successfully bucked five of the six 4-8 rivets in this location using a rubber washer around the bucktail end, but the sixth rivet had too much of a gap between the shim and spar web, and it would not come out for love or money despite getting the factory head off cleanly. I ruined a bunch of parts in the process of drilling it out. So I resolved to squeeze these six rivets if I could, in the interests of minimizing chances of ruining more parts.

In good news I have lots of scrap parts to practice on for later.
__________________
Will, building an RV-9A
Horizontal stabilizer in progress
Donated September 2019
Reply With Quote
  #7  
Old 06-06-2020, 07:42 PM
RV10Man RV10Man is offline
 
Join Date: Jan 2005
Location: Oklahoma City, OK
Posts: 924
Default

Put a rivet in it and move on.
__________________
RV9A under construction--N781DM reserved
Donated
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 02:45 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.