VansAirForceForums  
Home > VansAirForceForums

- POSTING RULES
- Donate yearly (please).
- Advertise in here!

- Today's Posts | Insert Pics


Go Back   VAF Forums > Model Specific > RV-10
Register FAQ Members List Calendar Today's Posts

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 02-27-2020, 10:28 AM
oren_rokach oren_rokach is offline
 
Join Date: Dec 2018
Location: Tel-Aviv Israel
Posts: 174
Default Single / Dual pulley

Hi guys,
I am about to pull the trigger and order the engine, since I of the few month's lead time.
There is an option for dual / single pulley. same price
I decided not to install AC eventually. any reason to order dual pulley? any reason not to ? if same price? some future use?

thanks for your help!
Oren
__________________
Oren Rokach
4X-ODU
RV-10 QB
Cabin top installed, doors completed!
Wings almost done

Blog:
https://4x-odu.blogspot.com/

VAF 2020 dues paid!
Reply With Quote
  #2  
Old 02-27-2020, 10:59 AM
lr172 lr172 is offline
 
Join Date: Oct 2013
Location: Schaumburg, IL
Posts: 5,277
Default

Quote:
Originally Posted by oren_rokach View Post
Hi guys,
I am about to pull the trigger and order the engine, since I of the few month's lead time.
There is an option for dual / single pulley. same price
I decided not to install AC eventually. any reason to order dual pulley? any reason not to ? if same price? some future use?

thanks for your help!
Oren
I learned from Paddy that you can't install the SDS magnets on the dual pulley flywheel. In case you are considering that. I can't think of a reason to have it, beyond AC or experimentation with a supercharger.

Larry
__________________
N64LR - RV-6A / IO-320, Flying as of 8/2015
N11LR - RV-10, Flying as of 12/2019
Reply With Quote
  #3  
Old 02-27-2020, 11:25 AM
Gaylon's Avatar
Gaylon Gaylon is offline
 
Join Date: Aug 2006
Location: Friendswood, TX
Posts: 82
Default Magnets on dual pulley

Quote:
Originally Posted by lr172 View Post
I learned from Paddy that you can't install the SDS magnets on the dual pulley flywheel. In case you are considering that. I can't think of a reason to have it, beyond AC or experimentation with a supercharger.

Larry
Yes you can install the magnets on a dual pully and use SDS. Several RV10s flying this configuration now.

As for dual/single. If you aren?t adding AC then you dont need the second pully.
__________________
Gaylon Koenning
RV-10 #40468
N815DG, Flying
G3X, GTN750, GTS800
Barrett IO-540, 9:1, Cold Air,
Dual SDS Electronic Fuel/Ignition (EM5, V29.1)
Polly Ranch Airpark(7XS0)
Friendswood, TX
Dues Paid 2019
http://www.TexasRV10.com
Reply With Quote
  #4  
Old 02-27-2020, 12:01 PM
lr172 lr172 is offline
 
Join Date: Oct 2013
Location: Schaumburg, IL
Posts: 5,277
Default

Quote:
Originally Posted by Gaylon View Post
Yes you can install the magnets on a dual pully and use SDS. Several RV10s flying this configuration now.

As for dual/single. If you aren’t adding AC then you dont need the second pully.
Maybe there are different styles of pulleys out there. Apparently SDS told another RV10 / 540-D4A5 owner that it wouldn't work on his dual pulley flywheel. Might be worth investigating further for the OP if there is interest i in that.

Larry
__________________
N64LR - RV-6A / IO-320, Flying as of 8/2015
N11LR - RV-10, Flying as of 12/2019
Reply With Quote
  #5  
Old 02-27-2020, 02:27 PM
Dustyone Dustyone is offline
 
Join Date: Oct 2012
Location: Brisbane,Austalia
Posts: 188
Default A/C and SDS, YES delete flywheel from Lycoming

Hi Oren,

If your plan is to have Air Flow Systems A/C, YES, delete the flywheel and order the flywheel from Bill at Air Flow Systems.
This flywheel will have the standard A section V groove for the alternator and the serpentine belt grove for the A/C.
This flywheel can also except the SDS magnets, however, just ask Ross at the time of ordering to supply a modified drill guide as the tooling holes on Bill's flywheels are are different size.

If your plan is to have SDS ignition only, YES, delete the flywheel as the latest supplied flywheels from Lycoming do not have any tooling holes that you need for Ross's drill guide. Then order one of Ross's cool Flywheels
( photos of supplied Lycoming flywheel on this page about half way down, http://www.sdsefi.com/lycoming6.htm )

Cheers,
__________________
Ashley Miller
RV-10 #40597
Dual SDS CPI
http://www.vansairforce.com/communit...d.php?t=140051
Airflow Systems Air-Con
http://www.vansairforce.com/communit...4&postcount=15
VH-XTE 700hrs +
Redcliffe,Brisbane
Australia
Photos : https://goo.gl/photos/zsfBeVofHMe4ze7i7

Last edited by Dustyone : 02-27-2020 at 03:22 PM.
Reply With Quote
  #6  
Old 02-27-2020, 02:35 PM
AlpineYoda AlpineYoda is offline
 
Join Date: Nov 2019
Location: Boulder, CO
Posts: 136
Default

I know that at least one FIKI kit requires the second pulley. So, if you live someplace you never need AC, will you need the opposite?
__________________
RV-10 build blog -- https://eaabuilderslog.org/?blproject&proj=7ZSwfzr2g
Tail finished March 2020
Wings finished July 2020
Fuselage joined to tailcone on July 19, 2020

N1814T reserved with FAA
Donated through 12/31/2020, EAA and AOPA member

When it absolutely, positively doesn't matter when or if it ever gets there, ship with Old Dominion.
Reply With Quote
  #7  
Old 02-27-2020, 02:41 PM
oren_rokach oren_rokach is offline
 
Join Date: Dec 2018
Location: Tel-Aviv Israel
Posts: 174
Default

Thanks a lot guys!!
__________________
Oren Rokach
4X-ODU
RV-10 QB
Cabin top installed, doors completed!
Wings almost done

Blog:
https://4x-odu.blogspot.com/

VAF 2020 dues paid!
Reply With Quote
  #8  
Old 02-27-2020, 06:07 PM
Tassie Tassie is offline
 
Join Date: Oct 2014
Location: Cambridge, Tas. Australia
Posts: 54
Default Two more notes

Two more comments:

If you want to drill the AFS flywheel for the SDS magnets, you need to drill through and restore the serpentine belt grooves - see here - and there's a bit of pucker factor involved in this operation.

If you fit a dual pulley flywheel, you need a different (than standard) mounting bracket for a B&C alternator, I don't have the details here but check with B&C support and they will set you straight on what you need. If you just order the standard mounting bracket, it will position the alternator at the wrong fore/aft position. I can't comment on PP alternators.
__________________
Adrian Port
RV-10 emp done, wings 90%, fuse 90%, cabin top DONE!
www.tasrv10.com
Reply With Quote
  #9  
Old 02-27-2020, 09:49 PM
oren_rokach oren_rokach is offline
 
Join Date: Dec 2018
Location: Tel-Aviv Israel
Posts: 174
Default

Quote:
Originally Posted by Tassie View Post
Two more comments:

If you want to drill the AFS flywheel for the SDS magnets, you need to drill through and restore the serpentine belt grooves - see here - and there's a bit of pucker factor involved in this operation.

If you fit a dual pulley flywheel, you need a different (than standard) mounting bracket for a B&C alternator, I don't have the details here but check with B&C support and they will set you straight on what you need. If you just order the standard mounting bracket, it will position the alternator at the wrong fore/aft position. I can't comment on PP alternators.
Thanks Adrian!
__________________
Oren Rokach
4X-ODU
RV-10 QB
Cabin top installed, doors completed!
Wings almost done

Blog:
https://4x-odu.blogspot.com/

VAF 2020 dues paid!
Reply With Quote
Reply



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 04:36 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.