Posts: 1,474
|
|
Returning to the OP's question - I had to get a bigger piece of fire sleeve than what was provided in the kit to do the outer "wrap". I had some laying around fortunately.
|

01-03-2019, 07:15 AM
|
 |
|
|
Join Date: Mar 2006
Location: Newport, TN
Posts: 7,496
|
|
Like others have said, for single cables use the steel multi piece eyeball pass through?s mentioned above. Harder to install but worth it! The single hole aluminum ones are junk!
As for wires/bundles you can get all the parts to build them yourself way cheaper if you buy the parts to make it individually. You can buy the stainless flange from hardware stores or amazon. Look for stainless closet rod holders. They are less than $10 for a pair of them.
I did not do this on my 7 but will on my 10!
|

01-03-2019, 07:54 AM
|
|
|
|
Join Date: Jan 2015
Location: Jamestown,NY
Posts: 631
|
|
A thread I found
__________________
9A in progress
Working on Finish kit!!
Mattituck TMXIO-360 red gold
Dues paid Jan 2020
|

01-03-2019, 11:28 AM
|
|
|
|
Join Date: Jan 2015
Location: Jamestown,NY
Posts: 631
|
|
which size?
I see on Amazon there are different sizes of these stainless rod holders. Is the 1 inch diameter big enough if using 2 of them? I think the other is 1.3 inches inside diameter. Is this like anything else where bigger is better?
__________________
9A in progress
Working on Finish kit!!
Mattituck TMXIO-360 red gold
Dues paid Jan 2020
|

01-03-2019, 11:45 AM
|
|
|
|
Join Date: Dec 2014
Location: South Island ,New Zealand
Posts: 77
|
|
I had the same concerns about the firewall sleeves and had it confirmed by Vans that we use the FAE102-11x1 ft sleeve they send with firewall forward kit. Apparantly we make that fit for both the inner and outer pass through by splitting that sleeve.
|

01-03-2019, 11:53 AM
|
|
|
|
Join Date: Jun 2010
Location: Sunman, IN
Posts: 2,189
|
|
How many
I have a large one and a small one. The large one was required to pass the EFII harness connectors through. I separated the EGT/CHT wires to the small one, as was recommended by Garmin.
I now have a System 32 EFII harness which includes bulkhead connectors so I really did not require the large pass through, 2-1" pass throughs would have been sufficient.
__________________
Bob
Aerospace Engineer '88
RV-10
Structure - 90% Done
Cabin Top - Aaarrghhh...
EFII System 32 - Done
297 HP Barrett Hung
ShowPlanes Cowl with Skybolts Fitted - Beautiful
Wiring...
Dues+ Paid 2019,...Thanks DR+
|

01-03-2019, 12:36 PM
|
|
|
|
Join Date: May 2006
Location: Pocahontas MS
Posts: 3,884
|
|
Quote:
Originally Posted by dwranda
I see on Amazon there are different sizes of these stainless rod holders. Is the 1 inch diameter big enough if using 2 of them? I think the other is 1.3 inches inside diameter. Is this like anything else where bigger is better?
|
1st, decide whether you need to pull assembled connectors or control cables through the hole(s). If yes, then the connectors/cable ends will define hole size. Bundle up everything you need to run through each hole, wrap the firesleeve, and measure.
Charlie
|

02-05-2019, 02:42 PM
|
|
|
|
Join Date: Nov 2012
Location: Midland, mi
Posts: 962
|
|
I am debating adding a few extra pass throughs. An A&P suggested that all the cables go through individual eyeball fittings, then the wires can run through the two original pass thru locations. Anybody do this? If so, then where did you place the eyeball fittings.
I did purchase pass through kits from ACS to bundle and protect the wires after coming through the firewall.
Unfortunately, I just finished insulating the firewall, so putting in eyeball fittings might be a nightmare. I have the insulation and the engine mount in place. The though of all the shavings from drilling make me sick to think about cleaning up.
Thanks
__________________
Ken Stockman
Midland, MI
EAA Chapter 1093 member
FaceBook Page: Ken's RV-14
RV-14a (serial number 140073)
N73XP
Plane at hangar and the wings ON.
|

02-06-2019, 05:31 AM
|
 |
|
|
Join Date: Oct 2008
Location: Arlington, WA
Posts: 799
|
|
Quote:
Originally Posted by Stockmanreef
... so putting in eyeball fittings might be a nightmare. I have the insulation and the engine mount in place. The though of all the shavings from drilling make me sick to think about cleaning up.
Thanks
|
I just purchased this hydraulic punch set from Amazon Aircraft Stuff. Tool quality is basic HF/Chinese but it makes an easy and clean punch thru the SS firewall.
https://www.amazon.com/OrangeA-Hydra...ydraulic+punch
__________________
_______________________________
Scott "Grumpy" Stewart
RV-7 N957RV (First Flight on Dec 18, 2009 )
RV-14 N144P (Empennage complete, wings almost complete, fuselage almost complete)
#866 on the Van's RV-7 hobbs
#6563 on Van's generic hobbs
Arlington, WA
|

02-07-2019, 05:41 PM
|
|
|
|
Join Date: Nov 2012
Location: Midland, mi
Posts: 962
|
|
Any thoughts about using something like the aluminum bulkhead in the link below as a pass thru for the cable, if it were made out of stainless steel? It would not allow for rotation like an eyeball fitting, but it would require a much smaller hole in the firewall.
https://www.jegs.com/i/Earls/361/983210/10002/-1
__________________
Ken Stockman
Midland, MI
EAA Chapter 1093 member
FaceBook Page: Ken's RV-14
RV-14a (serial number 140073)
N73XP
Plane at hangar and the wings ON.
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 01:32 AM.
|