Having completed the HS SB I am moving on to stab fairing (Van?s).
I don?t understand so many notches- As I interpret the instructions, the fairing goes ?inbound? over the rib; ie skin , rib the fairing. Of course except for the 10 rivets that are rib to skin& rib to rib.
Has anyone match drilled the fairing before they install the ribs ? This technique would seem to better limit enlarging skin holes.
Thanks
|