Section 21 dimpling question
Stopping so I don't do something stupid. Need clarification on Section 21iS/U-03 step 3 which tells you to rivet F-01221-R-1 to the floor, F-01224-R-1.
Step 2 says dimple the two #30 holes but says nothing about the #40 holes in the ribs.
That's significant because 21IS/U-02 tells you in step 4 to dimple those holes in the floor.
Those dimples can't be accommodated in the rib. But there is no instruction I see to do so..
That would be very un-Vanslike so I'm missing something. What is it?
|

12-10-2017, 08:23 PM
|
|
|
|
Join Date: Mar 2005
Location: Huntsville, AL
Posts: 427
|
|
2 cents
Quote:
Originally Posted by LettersFromFlyoverCountry
Stopping so I don't do something stupid. Need clarification on Section 21iS/U-03 step 3 which tells you to rivet F-01221-R-1 to the floor, F-01224-R-1.
Step 2 says dimple the two #30 holes but says nothing about the #40 holes in the ribs.
That's significant because 21IS/U-02 tells you in step 4 to dimple those holes in the floor.
Those dimples can't be accommodated in the rib. But there is no instruction I see to do so..
That would be very un-Vanslike so I'm missing something. What is it?
|
Hi Bob,
I'm not near my plane nor the plans, so I looked at Van's site and pulled up the drawing. I remember this is an area where I had to "walk away for a bit", clear my head and start fresh. A couple of thoughts...OK maybe more...
Thought 1 - pay attention to the dotted lines in the illustration that tell you to do things only in certain areas.
Thought 2 - the instruction says to dimple holes in the ribs "that correspond to dimpled holes in the floor" (paraphrase) so you're building on what you did earlier, make sure that was done correctly.
Thought 3 - The illustrations are rotated between figure 1 and 2, so make sure you "have your bearings"
Hope this is helpful. It's an area of the construction that is a maze of parts, holes, and lines/arrows. Go slowly and carefully, it'll be fine.
Also, I saw a revision for Section 21 listed. I don't recall if it was related, but worth checking the Mothership.
All the best,
Dave
__________________
Dave
RV12 N951DZ
First Flight 9/23/16!
No paint yet. Working on a scheme with John Deere colors or accents.
|

12-10-2017, 08:34 PM
|
|
|
|
Join Date: Dec 2007
Location: Brentwood, CA
Posts: 659
|
|
Quote:
Originally Posted by LettersFromFlyoverCountry
Stopping so I don't do something stupid. Need clarification on Section 21iS/U-03 step 3 which tells you to rivet F-01221-R-1 to the floor, F-01224-R-1.
Step 2 says dimple the two #30 holes but says nothing about the #40 holes in the ribs.
That's significant because 21IS/U-02 tells you in step 4 to dimple those holes in the floor.
Those dimples can't be accommodated in the rib. But there is no instruction I see to do so..
That would be very un-Vanslike so I'm missing something. What is it?
|
You do need to dimple nutplate holes, which are #40, not #30; you’ll want to dimple every hole that matches up with the baggage floor, except for the screw holes. Later on, you’ll find out that you’re using AN526 screws, which are truss head and do not use dimpling. Just do the holes where the flanges match up with the baggage floor.
BTW, this would be a good time to verify that your fuselage complies with SB 14-12-06, as you would install the SB parts in step 8 on this page...and nothing sucks like re-work.
__________________
Ron Gawer
- RV10, Build in progress.
- RV12, N975G, "The Commuter"...many great hours and happy landings so far.
- Several others that are now just great memories for me.
Last edited by rongawer : 12-10-2017 at 08:37 PM.
|

12-11-2017, 05:43 AM
|
 |
|
|
Join Date: Jan 2005
Location: St. Paul, MN.
Posts: 4,792
|
|
Quote:
Originally Posted by rongawer
You do need to dimple nutplate holes, which are #40, not #30; you?ll want to dimple every hole that matches up with the baggage floor, except for the screw holes. Later on, you?ll find out that you?re using AN526 screws, which are truss head and do not use dimpling. Just do the holes where the flanges match up with the baggage floor.
BTW, this would be a good time to verify that your fuselage complies with SB 14-12-06, as you would install the SB parts in step 8 on this page...and nothing sucks like re-work.
|
That's what I thought. There are two #30 holes on that edge that need dimpling but not having the 40's called out was a signal to stop.
This is the new RV-12iS design, so I'm presuming the fuse complies
|

12-11-2017, 06:03 AM
|
|
|
|
Join Date: Dec 2007
Location: Brentwood, CA
Posts: 659
|
|
Quote:
Originally Posted by LettersFromFlyoverCountry
This is the new RV-12iS design, so I'm presuming the fuse complies
|
Sounds like you’re on the right track.
The SB is for fuselages from sometime in 2014 and earlier. I just saw the drawing and remembered it; you should be fine.
__________________
Ron Gawer
- RV10, Build in progress.
- RV12, N975G, "The Commuter"...many great hours and happy landings so far.
- Several others that are now just great memories for me.
|

12-11-2017, 02:51 PM
|
 |
|
|
Join Date: Jan 2005
Location: St. Paul, MN.
Posts: 4,792
|
|
Heard back from Van's: It's an error in the instructions that the #40 holes and the need to dimple them in the rib isn't mentioned. So...dimple away.
|

06-03-2018, 08:27 PM
|
|
|
|
Join Date: Jan 2016
Location: Knoxville, IL
Posts: 100
|
|
I just got to this step and was confused as well. Thanks for doing ?the leg work?. I will dimple away!
__________________
RV12 - building
Empennage finished
Wings finished
iS Fuselage in progress
ULS Fuselage kit - SOLD
Farmer - corn & soybeans
Firefighter
Knoxville, IL
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 12:57 AM.
|