DR, thanks for the shoutout on the front page today! It moved the motivation meter to the right a notch or two.

PS: I didn?t notice the typo until I read it on the front page, but I was in the airplane because I couldn?t remove the control column from the outside...
__________________
Miles (VAF# 1238, Paid up as of 12/20)
RV-7 TU 904KM (reserved)
Wings Fitted and Finish Kit on site

Construction Log
Empennage Album, Wings Album, Fuselage Album

1955 Cessna 170B flying since 1982

'To get something you never had, you have to do something you never did.' -Unk.
Reply With Quote
  #122  
Old 04-25-2018, 10:36 PM
longranger's Avatar
longranger longranger is offline
 
Join Date: Mar 2007
Location: 45G, Brighton, MI
Posts: 1,921
Default

I've had the SB 14-01-31 repair kit for a couple of years now, and thought I'd get it installed before attaching the horizontal stabilizer to the fuselage. The number of enlarged holes in the spars, ribs, and angles (some of which date back to the original construction) has been bugging me, so I sent an email to Vans. Sterling concurred, so I am replacing the front spars, attach and reinforcement angles, inboard ribs, and new pre-drilled doublers.

I ordered parts Monday, and they are due Saturday. Yesterday I started drilling out the front spars. 3-1/2 hours into it, I have the left front spar removed, and am about 2/3 the way through the right.

Enlarged holes in the attach and reinforcement angles:


Left front spar removed:
__________________
Miles (VAF# 1238, Paid up as of 12/20)
RV-7 TU 904KM (reserved)
Wings Fitted and Finish Kit on site

Construction Log
Empennage Album, Wings Album, Fuselage Album

1955 Cessna 170B flying since 1982

'To get something you never had, you have to do something you never did.' -Unk.
Reply With Quote
  #123  
Old 04-27-2018, 05:41 AM
Skykingbob's Avatar
Skykingbob Skykingbob is offline
 
Join Date: May 2012
Location: Bealeton Virginia
Posts: 577
Default Good Choice

Hey Miles.....I did the same thing. I started doing the SB and got some elongated holes. So I ended up drilling skins and replacing anything that
was needed.....got a great HS and confidence that all is in great shape. Not worrying about those egg shaped holes in the back while I will be flying in the front Replaced both front spars and one reinforcement...the other one came out real nice and could be reused.

Also saw the pics of the C-170.....very nice!!!
__________________
Bob "Skyking" Corriveau
"PRINCE TRAPPED IN A PILOT'S BODY"
Yes I paid my =VAF= membership dues!
RV-8 QB Reserved N212KB
ATP
CFI/CFII/MEI

Build Site: http://www.mykitlog.com/skykingbob/

"Nothing worthwhile has ever been accomplished without inspiration, determination, and perspiration!"
Reply With Quote
  #124  
Old 04-27-2018, 09:37 AM
longranger's Avatar
longranger longranger is offline
 
Join Date: Mar 2007
Location: 45G, Brighton, MI
Posts: 1,921
Default

Thank you Bob. Looking at now, I don?t know why there was ever any question about replacing the spars...
__________________
Miles (VAF# 1238, Paid up as of 12/20)
RV-7 TU 904KM (reserved)
Wings Fitted and Finish Kit on site

Construction Log
Empennage Album, Wings Album, Fuselage Album

1955 Cessna 170B flying since 1982

'To get something you never had, you have to do something you never did.' -Unk.
Reply With Quote
  #125  
Old 04-29-2018, 09:57 PM
longranger's Avatar
longranger longranger is offline
 
Join Date: Mar 2007
Location: 45G, Brighton, MI
Posts: 1,921
Default

Another 30 minutes in the shop Friday, and I had the right front spar out of the horizontal stabilizer, completing the first "R" in this R&R project. That blinding light in the upper left of the photo below is sunshine streaming through an open hangar door, something we've seen precious little of around here this year...


Saturday, while awaiting delivery of new parts for the HS, I spent several hours finishing up steel flap pushrods to replace the aluminum ones I wasn't particularly happy with (threads too loose on at least one). After tapping these new ones, I now have a better appreciation on just how tough 4130 really is. I used the same setup I used with the aluminum tubes, removing the handle and cone from my RoloFlare tool and squarely but loosely mounting it on my drill press to make it self-centering, but with the steel, I could only get about 2-3 full turns or so with the tap (drive belts removed, turning the chuck by hand), and had to clamp the flaring tool with tube and tap in the bench vice, and turn the tap with a wrench. I had to break chips about every 1/4 turn, so it was quite a tedious process, but well worth it IMHO.







As expected, I received the repair parts for my horizontal stabilizer Saturday afternoon, as well as a flash drive containing the RV-7 manual and plans. Vans even cut the HS-00001-1 spar doublers in two for me so everything would fit in a 5-inch diameter mailing tube!


After inventorying the parts, I printed out the pertinent pages of the manual and sections of DWG 3 that differ from the original plans and drawing, but didn't have time to get started.

After a breakfast flight this morning with 5 airplanes and 7 folks from Brighton (including an RV-6A and my 170), I spent about 4 hours in the hangar cleaning up about 6 months of disorganization and saying "I'll get to that later". (Check the workbench in the background of the first photo in this post. ) I even found several items that I forgot I owned, including a fire extinguisher, which I promptly mounted. I now have my workbench to the point that there's room for working on the stabilizer repair.



Just about the time I got the new stabilizer parts laid out on the freshly cleaned bench, neighbors noticed the hangar door open and started showing up, so the beer light went on. Of the three that showed up, two had also been spring cleaning in their own shops, and the third had spent the day on some long-delayed exterior maintenance on the airport clubhouse. I was glad to point each one of them to the fresh pint glasses on the kegerator (currently Killian's Irish Red)... they had earned it!

No shop time logged today, as I have a 8-hour bottle to tool rule...
__________________
Miles (VAF# 1238, Paid up as of 12/20)
RV-7 TU 904KM (reserved)
Wings Fitted and Finish Kit on site

Construction Log
Empennage Album, Wings Album, Fuselage Album

1955 Cessna 170B flying since 1982

'To get something you never had, you have to do something you never did.' -Unk.

Last edited by longranger : 04-30-2018 at 07:19 AM.
Reply With Quote
  #126  
Old 04-29-2018, 10:56 PM
jcarne's Avatar
jcarne jcarne is offline
 
Join Date: Jul 2016
Location: Worland, Wyoming
Posts: 1,983
Default

Glad to see the build still pushing along Miles!
__________________
Jereme Carne
PPL
RV-7A Flying as of 03/2021
Exempt but gladly paying!

Last edited by jcarne : 06-28-2018 at 11:58 AM.
Reply With Quote
  #127  
Old 06-18-2018, 08:03 AM
longranger's Avatar
longranger longranger is offline
 
Join Date: Mar 2007
Location: 45G, Brighton, MI
Posts: 1,921
Default

I took delivery of the finish kit late Saturday afternoon. On Sunday morning I had an hour or so to get started on unpacking and inventory before getting ready for Fathers Day festivities. So far I?ve found the wheel fairings, empennage fairing, wing root fairings, canopy latch bar, and some hinge material, but mostly it?s just paper. I have laid eyes on the canopy, and what appears to be the wheel kit and tires (didn?t unwrap them yet). I assume the engine mount and a bunch of hardware are buried under the canopy.

Click image for larger version

Name:	IMG_3394.jpg
Views:	67
Size:	330.7 KB
ID:	4095
__________________
Miles (VAF# 1238, Paid up as of 12/20)
RV-7 TU 904KM (reserved)
Wings Fitted and Finish Kit on site

Construction Log
Empennage Album, Wings Album, Fuselage Album

1955 Cessna 170B flying since 1982

'To get something you never had, you have to do something you never did.' -Unk.

Last edited by longranger : 11-01-2020 at 04:47 PM.
Reply With Quote
  #128  
Old 06-19-2018, 07:36 AM
dwranda dwranda is offline
 
Join Date: Jan 2015
Location: Jamestown,NY
Posts: 657
Default

Congrats!! My garage looked like that just a couple weeks ago.
__________________
9A in progress
Working on Finish kit!!
Mattituck TMXIO-360 red gold
Dues paid April 2021
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 08:43 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.