Quote:
Originally Posted by asw20c
Two of the cables get sandwiched between two of the bulkheads and the left side skin that would be all but impossible to install after the skin is on.
|
Are you referring to the tail cone here?
I want to rivet the tail cone top skin the same way you did. Therefore, I'd like to have its wiring complete before adding the top skin. I'm seriously considering using the common wiring harness myself but I'll be adding at least one item that I don't think it provides for (a pulsing red beacon on the top of the VS for night ground ops).
It would also seem that I could do most of the wiring in the forward fuselage prior to adding the tail cone. I may have the tub sitting on a low dolly but I anticipate a lot of backaches that way. I'm wondering how others, particularly other QB builders, have attacked that access issue (e.g., tub on side, rotisserie, low dolly, or some other means).