I did clamp the F711 bars to the rear spar prior to drilling, and made my initial holes at #30, cleco'ing as I drilled. I put one hole in each side, measured to make sure, then drilled out the other. Then I went back and drilled to #12, replacing holes with bolts. Remember to check your triangulation measurements from a single point to each end of the HS. I used a particular rivet near the firewall to make sure the HS was square with the thrust line.
Last edited by RV9Aforme : 11-14-2015 at 03:34 PM.
|