What is your build time on your second plane?
I have searched the forums, and have not seen my exact same question, so I am wondering...
We started our RV6A in 1991, were able to work full time for several months. We were in a place with experienced builders, all tools needed, and unlimited technical advice. We did all building ourselves but did not have to waste any time head scratching.
It took us 3298 hours.
Our kit was very slow build. At the time there were no pre punched. We cut lightening holes, straightened ribs with fluting pliers and hand seamers, located and drilled every hole, (except spar and wing attach bulkhead, which were all pre drilled I think), built the fuselage in the dreaded jig, etc etc.
So I am curious for those who have built more than one RV, regardless of model. How long did it take you to build your very slow build kit, and how long for your next one that was a pre punched?
I am curious how much time the pre punched kit saves the same builder.
thanks
__________________
RV-6A slow build,
serial # 21681. First flight March 1993
Dec 2019 donation paid
|

08-28-2015, 09:13 PM
|
|
|
|
Join Date: Apr 2006
Posts: 201
|
|
Old vs. new kits
In the 1990's I also built an old RV6 kit with the same jigs you used. I did everything myself, bought few option kits, and basically did things the "long" way as I had a good Cessna 170 to fly. It took me over 4000 hours over 7 years to complete it. In about 2005 I acquired an RV8 tail kit followed by a wing kit which were all matched hole and went together really quickly. These were all raw kits and not quick build kits. After about 950 hours logged I had completed the airframe well beyond quick build stage and ordered the finish kit where I am now.
I found the RV8 extremely easy to build with no jigs. The RV8 fuselage is made in panels rather than skinning a skeleton like the older kits...it doesn't require a jig. Wings could be built on a table, but I found the "H" jig from the old RV6 days more comfortable for a short person to deal with so I used that. Like the entire kit, the wings went together real fast. Spars are ready made compared to the channel, bars, and angles in the RV6. The matched hole kits are light years ahead of the old kits BUT I enjoyed building the older kit much more as I am a builder first and a pilot second type of person. The RV6 is still in my hangar with 500 hours on it so I do not NEED another plane. It is a project as I am retired so I have different needs than most. I would estimate the work is about 40% less in the new kits than the old but there is not as much flexibility in the build process as everything is already laid out, punched, and fit for you. This leaves a lot of deburring, polishing, and boring tasks left for the builder while all the layout is done by the factory. I find that layout work as necessary to keep my interest up so I find the old kits better in that regard. Van's sales figures in recent years says that my thinking on this is not what the customer wants and I admit it.
I did rebuild an RV4 wreck and found that to be even more primitive than the RV6. It could be rebuilt with minimal parts because it was all angle and flat sheet with blueprints containing good dimensions verses assembly instructions on an isometric print of today's kits that do not show enough information to build a part from. A new part must be ordered in most cases.
This is my take on the old verses the new kits.
Dick DeCramer
Las Cruces, NM
RV6 N500DD
RV8 Starting Canopy
|

08-29-2015, 06:24 AM
|
 |
|
|
Join Date: Sep 2006
Location: Landing field "12VA"
Posts: 1,530
|
|
Wondering the same thing
I built my 6A in '94-98. No idea how many hours it took. I had no help but the Orndorf videos, little internet back then, and no prior experience save a Rans S-12. Now I'm rebuilding a house and re-acquiring tools so I can start a 10, or failing that, a 14. I will have VAF and all the internet as resources, but geographically it will still be a lone-wolf build, far from any airport but my own. I'm hoping the skills I apparently once had all come back to me.
One sure difference is not the kits, but the man: I knew nothing of reading glasses in 1998; can't fix a cup of coffee without them, now. Definitely sucks some of the fun out of the everyday little things.
-Stormy
|

08-29-2015, 07:47 AM
|
|
|
|
Join Date: Jun 2015
Location: Alberta
Posts: 84
|
|
10-4 on the reading glasses. 20 years ago I could almost read a newspaper in the dark, now not so much.
I also enjoyed the fabricating but I did not mind the drill, deburr, repeat. I found it quite satisfying. Love to rivet so cannot imagine getting a quick build kit.
My previous build partner has no more interest. Seems he only had one plane in him, and I wonder if I have another myself.
So just toying with the idea. The 10 looks like the ultimate 4 place plane and would sit nice beside the 6A.
__________________
RV-6A slow build,
serial # 21681. First flight March 1993
Dec 2019 donation paid
|

08-29-2015, 07:56 AM
|
 |
|
|
Join Date: Jun 2005
Location: Cedar Park, TX
Posts: 3,156
|
|
First one was 2yrs 7mo standard build hot and heavy. Second one is 7yrs and counting but still having a ball.
__________________
Scott Card
CQ Headset by Card Machine Works
CMW E-Lift
RV-9A N4822C flying 2200+hrs. / Cedar Park, TX
RV8 Building - fuselage / showplanes canopy (Done!)
|

08-29-2015, 09:59 AM
|
|
|
|
Join Date: Mar 2011
Location: zeeland michigan
Posts: 127
|
|
same for me
these posts fit me perfectly.
__________________
built rv-4 started 1987 finished 1996 now building rv-7, fitting cowl
|

08-29-2015, 10:03 AM
|
 |
|
|
Join Date: Jul 2005
Location: Hubbard Oregon
Posts: 9,035
|
|
The prior build experience has more influence on build time of the second kit that prepunching does.
Even a person that builds two prepunched kits, the build time of the second one is typically reduced by 1/3 of the time. It is not unheard of for an RV-4 or 6 builder to build a 7 or 8 in 1/2 the time of their first.
__________________
Opinions, information and comments are my own unless stated otherwise. They do not necessarily represent the direction/opinions of my employer.
Scott McDaniels
Van's Aircraft Engineering Prototype Shop Manager
Hubbard, Oregon
RV-6A (aka "Junkyard Special ")
|

08-29-2015, 09:10 PM
|
|
|
|
Join Date: Sep 2009
Location: NA
Posts: 47
|
|
23 months for standard build 7A. 2nd go round was 7 1/2 months for a quick build 7A.
The longest was the 3rd 7A quick build wings and standard fuse in 30 months.
Having an RV to fly already really slows down the build
|

08-30-2015, 08:50 AM
|
 |
|
|
Join Date: Jan 2005
Location: Auburn, WA
Posts: 668
|
|
18 months and 1800 hours for the first 9A.
11 months for the 8 (didn't count hours)
It does get easier!
__________________
Andy Karmy
Covington WA
RV-8 - Flying!
RV-9A - sold
Dec 2019 Paid
|

08-30-2015, 01:10 PM
|
 |
|
|
Join Date: Jul 2005
Location: Hubbard Oregon
Posts: 9,035
|
|
Quote:
Originally Posted by rvbuilder2002
The prior build experience has more influence on build time of the second kit that prepunching does.
Even a person that builds two prepunched kits, the build time of the second one is typically reduced by 1/3 of the time. It is not unheard of for an RV-4 or 6 builder to build a 7 or 8 in 1/2 the time of their first.
|
Clarification.....
My comments are in the context of actual build hours.
Build times quoting months or years are not of much value without knowing how many hour's per week the project was worked on.
__________________
Opinions, information and comments are my own unless stated otherwise. They do not necessarily represent the direction/opinions of my employer.
Scott McDaniels
Van's Aircraft Engineering Prototype Shop Manager
Hubbard, Oregon
RV-6A (aka "Junkyard Special ")
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 06:31 AM.
|