| alpinelakespilot2000 |
02-04-2005 11:10 AM |
documenting build process
Having just got started, I'm curious about how much I should be documenting my building. I'm trying to take a photo each work session (some with me in the picture), recording in my instruction manual the date I complete each task, and I will be eventually having an EAA tech inspector see my project whenever possible, but is there something I need to be doing beyond this to satisfy the FAA when I try to get the airworthiness cert.
Thanks,
Steve
|