VAF Forums

VAF Forums (https://vansairforce.net/community/index.php)
-   RV-14 (https://vansairforce.net/community/forumdisplay.php?f=109)
-   -   E-921 Gusset Drilling (https://vansairforce.net/community/showthread.php?t=199137)

RV701775 09-12-2021 03:28 PM

E-921 Gusset Drilling
 
Does anyone remember how they drilled the E-921 gussets on page 09-08 of the plants. If I try to drill from the inside into the forward spar, the other cleco holding the gussett is in the way, even with an angle drill. If I try to drill from the spar side, the root rib is in the way due to the angle.

I guess that I could just drill the spar holes without it being assembled.

Thoughts?

mc607 09-14-2021 09:31 PM

I donít recall having any issues with those. Did you try putting clecoes in from opposite side youíre drilling from? Did you try removing the 1008 rib while you drill? I do remember that the 907 rear spar flanges had to be tapered/filed down where they meet the root and tip ribs.

TASEsq 09-15-2021 03:46 AM

Here you go - I used the mega #30

https://tasrv14.blogspot.com/2019/03...inues.html?m=1


All times are GMT -6. The time now is 08:03 AM.