What's new
Van's Air Force

Don't miss anything! Register now for full access to the definitive RV support community.

Flap handle weldment

rv468

Active Member
I?m installing manual flaps in my RV-4. I have the flap linkages finished. I am getting ready to slot my floorboards to accommodate the flap linkage. The end of the Wd-406 flap handle weldment will be below the floor level when the flaps are at 40 degrees. I will have to make a much larger ?slot? in the floorboard for this. I?m wondering if everyone has the same situation. Possibly my flap handle weldment was manufactured incorrectly.

Thanks in advance,
Cameron Smith
RV4 #68
 
I feel your pain. When I built mine I had those stops on the seat postioned first and then tried to get everything else set up. No good. I started over by arranging the linkages so that the flap weldment is just a hair above the floor when the flaps are at 40 degrees. With this done, the flap handle ends up almost flat on the floor when the flaps are up. I then made and positioned the stops accordingly. This is just one data point and your weldment and/or seat position may be different.
 
Last edited:
Back
Top