aadamson
Well Known Member
All,
I know this isn't specifically RV related, but I'm looking for some knowledgeable people that can offer some constructive comments on my layout and electrical setup. I'm working to get this finalized this week if possible so I can get it off to the laser cutter and powder coater
So, to that end, I'm looking for a little help. I've got a panel design conceptualized, as a result I need to verify the most optimal buss, switch breaker, breaker and fuse counts.
http://www.highrf.com/Rockets/Panel Final.jpg - Panel layout
I've been using a spreadsheet that includes all the information including some tables that show busses and what's on each buss. I'm primarily focused on pull breakers, but all the details are there for switch breakers and fuses.
http://www.highrf.com/Rockets/Breaker Counts.xls - spreadsheet
This is a dual alt/batt 24v system with a 60 or 100amp main alt, and an SD-20 as backup. It will be using a slightly modified AeroElectric Z14 design,(modified because there is an avionics master on the primary buss).
Please let me know if you see any "gaping" holes in my thot process. The airplane uses a Chelton dual screen EFIS with electric instrument backup. There is no vacuum system.
Thanks for your time and any help is appreciated.
I know this isn't specifically RV related, but I'm looking for some knowledgeable people that can offer some constructive comments on my layout and electrical setup. I'm working to get this finalized this week if possible so I can get it off to the laser cutter and powder coater
So, to that end, I'm looking for a little help. I've got a panel design conceptualized, as a result I need to verify the most optimal buss, switch breaker, breaker and fuse counts.
http://www.highrf.com/Rockets/Panel Final.jpg - Panel layout
I've been using a spreadsheet that includes all the information including some tables that show busses and what's on each buss. I'm primarily focused on pull breakers, but all the details are there for switch breakers and fuses.
http://www.highrf.com/Rockets/Breaker Counts.xls - spreadsheet
This is a dual alt/batt 24v system with a 60 or 100amp main alt, and an SD-20 as backup. It will be using a slightly modified AeroElectric Z14 design,(modified because there is an avionics master on the primary buss).
Please let me know if you see any "gaping" holes in my thot process. The airplane uses a Chelton dual screen EFIS with electric instrument backup. There is no vacuum system.
Thanks for your time and any help is appreciated.
Last edited: