Just to give folks an idea of lead time and demand:
I ordered my wing kit on Tuesday 4/15. On Wednesday 4/16 I spoke with Van's about lead time. I was told that I was about "69th in line", but I didn't clarify if that meant that I was the 69th order or the 69th currently pending shipment. She told me that my lead time was about 10 weeks due to production, crating, and shipping constraints.
As an aside, I asked that they send my plans separately, and those arrived today. Very good service so far
I ordered my wing kit on Tuesday 4/15. On Wednesday 4/16 I spoke with Van's about lead time. I was told that I was about "69th in line", but I didn't clarify if that meant that I was the 69th order or the 69th currently pending shipment. She told me that my lead time was about 10 weeks due to production, crating, and shipping constraints.
As an aside, I asked that they send my plans separately, and those arrived today. Very good service so far
Last edited: